The Framing Sub Finished at 11:15 AM. MEP Started at 12:45 PM.
Ninety minutes vanished between them. Punch list disputes, PM confirmation delays, crew briefings, material repositioning. $2,170 — logged as zero.
The 90-Minute Gap — Broken Down
Four invisible causes. $2,170 in crew time. Every handoff. None of it in your daily log.
90-Minute Gap — Invisible in Every Daily Log
Where the 90 Minutes Go
Every minute accounted for. Every dollar traced. None of it captured without POD.
The 22-Minute Punch Dispute
Three unresolved punch items from the framing scope. Nobody documented them. Now Trade B is waiting while Trade A argues about scope boundary.
The 41-Minute PM Confirmation
Trade B won't mobilize until the PM confirms Trade A's work is complete. The PM is on a call. Then at another site. Response: 41 minutes.
The 18-Minute Repositioning
Materials staged for Trade A are blocking Trade B's work area. Neither documented the staging plan. Crew relocates equipment they didn't expect to move.
The 9-Minute Crew Brief
Trade B's foreman does a verbal briefing because there's no documented handoff status. Everyone hears a different version.
POD Closes the Gap — Before the Next Trade Arrives
Every handoff is structured. Every delay is logged. Every cost is attributed.
Punch Items Closed Before Handoff
POD requires punch item sign-off before a zone is marked complete. Trade A cannot hand off with open items — the system enforces it.
Instant Digital Completion Notice
When Trade A marks a zone complete, Trade B's foreman gets a push notification with scope summary, open items, and material staging notes. No PM required.
Staging Logged at Trade Completion
POD captures material positioning as part of zone closeout. Trade B knows exactly what is where before they arrive on site.
Handoff Brief Auto-Generated
Trade B's crew brief is auto-generated from the completion report — same information, every person, every time. No verbal game of telephone.
Handoff Quality and Decision Speed — The 90-Minute Gap Decoded
Two KPIs that make invisible handoff failures visible and measurable.
Handoff Score
PODDecision Latency
Every Handoff Feature You Need — Already Built
Zone Completion Enforcement
System blocks handoff until all punch items are documented and assigned.
Instant Handoff Notifications
Push alerts to the next trade with scope summary, open items, and material notes.
Handoff Score Tracking
Every trade handoff gets a quality score — identify which subs consistently hand off clean.
Decision Latency Monitoring
POD tracks how long decisions take. Slow decision-makers become visible immediately.
Gap Cost Attribution
Every minute of handoff delay is attributed to a cause and a cost. Nothing hides.
Historical Handoff Audit
Full log of every handoff event — who handed off, what state, how long the gap lasted.
Frequently Asked Questions
Your Next Handoff Gap Starts in 48 Hours.
POD captures every cause, every cost, every minute. The 90-minute gap becomes a 9-minute handoff.