Your Schedule Shows Green.
Your Site Says Otherwise.
Which One Is Lying?

Every Monday morning the schedule report goes to the owner: 97% SPI, on track, no issues. Every Monday morning the superintendent knows the truth: Sector C is 3 weeks behind, two trades are competing for the same space, and materials for the structural steel pour have not been confirmed. The report is lying. Nobody is asking why.

Reality Gap — Auto-Play

Your Software vs Your Site — Watch the Gap Appear

Both gauges start at zero. Watch where they end up.

Schedule Software0%ON TRACKPOD Site Flow Index0%SLIPPINGReality Gap0ptsP6 / MS ProjectPlan of Day

Field Reality vs Schedule Software — See Both in One Dashboard

WITHOUT POD
  • Monday report: 97% SPI — on track, no issues
  • Superintendent knows truth; report says otherwise
  • Owner receives weekly green report — project already 3 weeks behind
  • "How did this happen?" asked at 60% complete
WITH POD
  • POD: SiteFlowIndex 71% — 26-point reality gap flagged
  • Field flow data and schedule data visible side by side
  • EarnedScheduleTracker: slippage detected before SPI degrades
  • Early warning at week 2, correction at week 3

Field Reality vs Schedule Software — See Both in One Dashboard

Site flow measurement and earned schedule — the two-sided reality check

Site Flow Index

POD
0%
0%FLOW INDEX
Deliveries
Laydown Areas
Crane/Hoist
Waste Removal
Personnel Flow
0%
Flow Score
8
Deliveries
92%
Laydown Used

Earned Schedule

POD
0.00SPI(t)
+0.0days SV(t)target 0.95
0
ES (days)
0
AT (days)
0
PD (days)
SPI(t) Trend
Target 0.95
ProgressNaN% elapsed
Day 0Day 0

Schedule Reality FAQ

Stop Trusting the Report. Start Seeing the Site.

Your schedule software tells a story. Your site tells the truth. POD shows you both — and flags when they diverge.

Last updated: March 2026