Free Commercial Building POD Template
220 fields. 7 sections. Free HTML starter; Excel, Sheets & PDF with a POD subscription. Built for Commercial Building construction.
What's Inside This Template
7 sections covering every aspect of Commercial Building daily reporting.
Foundations & Below-Grade
14 fieldsTrack Excavation Volume, Shoring / Underpinning, Dewatering, Spread Footings Poured, and more
Structural — Concrete
14 fieldsTrack Concrete Placed, Concrete Mix #, Floor / Pour Location, Slump Test, and more
Structural — Steel
15 fieldsTrack Steel Erected, Pieces Erected, Column Installed, Beam / Girder Installed, and more
Building Envelope
15 fieldsTrack Curtain Wall Installed, Curtain Wall Mullions, Window / Glazing Installed, Exterior Wall Framing, and more
MEP — Mechanical
15 fieldsTrack Ductwork Installed, Ductwork Size / Type, AHU (Air Handling Unit) Set, RTU (Rooftop Unit) Set, and more
MEP — Electrical
11 fieldsTrack Conduit Installed, Wire / Cable Pulled, Panelboard Installed, Transformer Installed, and more
Interior Finishes
12 fieldsTrack Drywall / GWB Hung, Drywall — Taped & Finished, Ceiling Grid / Tile, Floor Tile Installed, and more
Why This Template Is Different
Built by construction professionals who understand Commercial Building projects.
This Template vs Generic
Commercial Building-Specific Features
This template has 220 fields. Generic templates have 20-30.
That's 9x more coverage for Commercial Building projects.
By Hand, This Takes 45 Minutes.
POD reads the files you already produce into your report and dashboard, then tracks your project as new files come in.
Before
Manual template
After
AI-powered Plan of Day
What a Ground-Up Commercial Daily Has to Carry
A generic daily report asks what got done. A commercial building daily has to prove what got done was witnessed. On a ground-up job under the IBC, the work that matters most is the work you cannot see a week later: rebar under a slab, bolts inside a fireproofed connection, firestop behind a rated wall, the air barrier behind the cladding. Chapter 17 special inspections exist because the building official knows that, and your daily is the record that ties the pour, the pick, and the test to the inspector who signed it.
The template below is built around hold points. Each phase carries the fields a superintendent actually fills in before releasing the next trade, and the ones the owner's representative and the AHJ will ask for at closeout.
Foundation and Concrete
Pre-pour hold point: rebar and embed inspection signed, mix design and slump on the ticket, cylinders cast and tagged to the placement location. Cold-weather and hot-weather protection noted by pour.
Structural Steel and Frame
Erection sequence by bay, high-strength bolt lots and turn-of-nut verification, field weld UT or MT results, and the leading-edge status of every open floor before the deck goes down.
Exterior Envelope
Air and water barrier lap and seal inspection ahead of cladding, curtain wall anchor embed layout confirmed to the shop drawings, window and mock-up water test results by ASTM E1105 before the wall closes.
Roofing
Deck acceptance and moisture reading, fastener pull tests, membrane seam probe results, and the manufacturer field representative visit that keeps the warranty alive.
MEP Rough-In
BIM clash sign-off by level before any duct, pipe, or conduit is hung. Above-ceiling inspection status by area. Firestop system numbers logged at each rated penetration.
Interior Finishes
Framing and in-wall inspections released by zone, ADA clearances measured at doors, restrooms, and reach ranges before drywall closes them in, and finish schedule progress by floor.
Elevator
Hoistway plumb and rail tolerance, machine room turnover, state elevator inspection date, and the fire service recall test coordinated with the fire alarm contractor.
Fire Protection and Commissioning
NFPA 13 hydrostatic test pressures and durations, NFPA 72 pre-test and final acceptance results, and ASHRAE 90.1 functional performance tests for HVAC, lighting controls, and envelope.
Special Inspections: Who Reviews the Entry
The Statement of Special Inspections names the agency, and the daily is where their field reports get tied to a date, a location, and a quantity. Concrete, high-strength bolting, welding, firestopping, and EIFS or envelope inspections are each logged with the inspector's name, the pass or fail result, and any non-conformance number. The engineer of record reviews structural entries, the architect reviews envelope and accessibility entries, and the building official reads all of it at the final inspection. A hold point with no witness recorded is a hold point that did not happen.
Hazards This Work Creates
Ground-up commercial stacks trades vertically, so the daily tracks who is working above whom. Steel erection carries leading-edge fall exposure until perimeter cable and deck are in, and the template records which floors are protected and which are controlled access. Every tower or mobile crane pick is logged with the load, the radius, and the signal person, with critical lifts flagged for the lift plan review. MEWP work in the envelope and MEP phases is noted by unit and operator, and the overhead-work exclusion zones below are part of the same entry. When a task disrupts a rated assembly or takes a sprinkler zone out of service, the fire watch and impairment notice go in the daily, not in a text message.
Frequently Asked Questions
A comprehensive Commercial Building Plan of Day (POD) should include these sections: Foundations & Below-Grade, Structural — Concrete, Structural — Steel, Building Envelope, MEP — Mechanical, MEP — Electrical, Interior Finishes. This template covers all of them with industry-specific fields tailored to Commercial Building construction workflows. It also addresses IBC, ADA, ASHRAE 90.1, NFPA 13/72, Local Building Code compliance requirements.
This Commercial Building POD template has 220 industry-specific fields organized across 7 sections. That is significantly more than generic construction templates which typically have 20-30 fields. Every field was designed by construction professionals who understand Commercial Building project requirements.
The HTML version is free — enter your name, email, and company and download it instantly. It covers all 220 fields across 7 sections. The editable Excel, Google Sheets, and fillable PDF versions are included with a POD subscription, and the 14-day trial counts.
Get Your Free Commercial Building Template
Quick form, instant download. 220 fields ready to go.