Back online
Oil, Gas & Petrochemical

Free Midstream / Gathering POD Template

220 fields. 5 sections. One-click Google Sheets copy. Built for midstream / gathering construction.

0
Fields
0
Sections
0
Role Variants
0
Export Formats

What's Inside This Template

5 sections covering every aspect of midstream / gathering daily reporting.

Gathering Pipeline

16 fields

Track row clearing, pipe stringing, pipe diameter / wall, pipe material, and more

Compressor Station

12 fields

Track station foundation concrete, compressor — set, compressor — type, compressor — alignment, and more

Metering & Measurement

7 fields

Track meter run / tube — installed, meter type, meter — calibration, prover loop, and more

Tank Battery & Storage

7 fields

Track tank — erected, tank — shell/bottom weld inspection, tank — hydro test, containment dike / berm, and more

Electrical & I&C

10 fields

Track power line / utility feed, generator, mcc / switchgear, cable, and more

Why This Template Is Different

Built by construction professionals who understand midstream / gathering projects.

This Template vs Generic

Fields
20–30220
Industry-specific sections
NoYes
Compliance coverage
BasicDOT PHMSA, API 1104, ASME B31.8, EPA, State
Role variants
15
Formats
Excel onlySheets, Excel, PDF, HTML
Cost
FreeFree

Midstream / Gathering-Specific Features

DOT PHMSA, API 1104, ASME B31.8, EPA, State compliance fields built in
5 sections tailored to midstream / gathering workflows
Every field mapped to a safety or performance metric
5 role variants: Superintendent, Foreman, PM, Safety, QC

This template has 220 fields. Generic templates have 20–30.

That's 9× more coverage for midstream / gathering projects.

This Template Takes 45 Minutes to Fill Out

Plan of Day's AI platform generates this entire document from a 5-minute voice report.

Before

Manual template

Open spreadsheet, type 220 fields
45 minutes per report
Static document with no insights
Copy-paste to distribute
No trend tracking or alerts

After

AI-powered Plan of Day

Speak for 5 minutes — AI fills every field
Auto-generated POD in seconds
Hundreds of KPIs calculated automatically
AI alerts for safety, budget, schedule risks
Instant distribution to entire team

Frequently Asked Questions

A comprehensive Midstream / Gathering Plan of Day (POD) should include these sections: Gathering Pipeline, Compressor Station, Metering & Measurement, Tank Battery & Storage, Electrical & I&C. This template covers all of them with industry-specific fields tailored to midstream / gathering construction workflows. It also addresses DOT PHMSA, API 1104, ASME B31.8, EPA, State compliance requirements.

This Midstream / Gathering POD template has 220 industry-specific fields organized across 5 sections. That is significantly more than generic construction templates which typically have 20-30 fields. Every field was designed by construction professionals who understand midstream / gathering project requirements.

Yes, the Midstream / Gathering POD template is completely free. Click the Google Sheets copy button to instantly create your own editable copy. No email, no account, no trial period. The template includes all 220 fields across 5 sections. You can also export to Excel, PDF, or HTML.

Get Your Free Midstream / Gathering Template

One click. No email. No account. 220 fields ready to go.

Last updated: March 2026