Construction Punch List

Deficiency log · walkthrough to substantial completion
Free template by
planofday.com
Plan of Day — the AI-powered replacement

1 · Project & Walkthrough Information

2 · Rollup Summary

Total Open Items

Life Safety

Code

Functional

Aesthetic

% Complete

Open > 14 Days

Open > 30 Days

Life Safety — blocks occupancy Code — AHJ compliance Functional — does not perform as specified Aesthetic — finish / cosmetic

3 · Punch List Tracker

# Room / Location / Area Building / Zone Trade Responsible Description of Deficiency Priority Date Identified Identified By Target Completion Status Date Completed Verified By / Sign-off Photo Ref (Before / After) Cost Notes

4 · By-Trade Breakdown

TradeOpenIn ProgressReady for ReviewVerified CompleteTotal
Drywall
Paint
Flooring
MEP
Millwork
Tile
Door / Hardware
Cleaning
Other

5 · By-Floor / Zone Breakdown

Floor / ZoneLife SafetyCodeFunctionalAestheticTotal Open

6 · Aging (Open Items)

7 · Substantial Completion Sign-off

Owner / Owner's Rep — Signature / Date
Architect
General Contractor — Signature / Date
Prepared By