Free Onshore Wind Farm POD Template

285 fields. 22 sections. Free HTML starter; Excel, Sheets & PDF with a POD subscription. Built for Onshore Wind Farm construction.

0
Fields
0
Sections
0
Role Variants
0
Export Formats

What's Inside This Template

22 sections covering every aspect of Onshore Wind Farm daily reporting.

Project Header

20 fields

Track Project Name, Project Number / Contract #, Report Date, Report # (sequential), and more

Weather Delay Tracking

6 fields

Track Days Precipitation Delayed Construction, Days Wind Delayed Construction, Days Lightning/Weather Delayed Construction, Total Weather Delay Days (cumulative), and more

Deliveries & Materials

19 fields

Track Foundation Bolts Received, Embedment Rings Received, Spreader Plates Received, Rebar - Bottom Mat Received, and more

Civil / Roads

28 fields

Track Clear & Grub - Today, Clear & Grub - JTD (cumulative), Clear & Grub - Remaining, Clear & Grub - % Complete, and more

Foundations

41 fields

Track Turbine ID, Clear & Grub Foundation Pad - Today, Clear & Grub Foundation - JTD / % Complete, Excavate Pads - Today, and more

Overhead Line (OHL) / Collector Line

25 fields

Track Pole Supply / Delivery - Today, Poles Delivered - JTD / Remaining / % Complete, Pre-Digging & Rock Breaking - Today, Pre-Digging - JTD / % Complete, and more

Underground Electrical / MV Collection

15 fields

Track MV Cable Install - Today, MV Cable - JTD / Remaining / % Complete, MV Cable - Voltage / Size, MV Terminations - Today, and more

Substation

39 fields

Track Substation Mobilization, Site Grading / Civil Works, Site Grading - Excavations, Site Grading - Backfill, and more

Turbine Erection

21 fields

Track Turbine Erection Mobilization, Turbine ID, WTG Component Offload - Today, WTG Offload - JTD / % Complete, and more

Grounding

13 fields

Track Ground Grid Installed - Today, Ground Grid - JTD / Remaining / % Complete, Fence Grounding - Today, Fence Grounding - JTD / % Complete, and more

O&M Building

20 fields

Track O&M Building Mobilization, Engineering / Design, Civil Works - Rough Grade, Civil Works - Excavations, and more

Manpower

27 fields

Track GC / Owner - Supervision, GC / Owner - Management, Sub 1 - Company Name, Sub 1 - Trade / Scope, and more

Equipment on Site

28 fields

Track Main Crane - Type / Capacity, Main Crane - Hours Operated, Main Crane - Hours Idle, Assist Crane - Type / Capacity, and more

Safety / HSE

25 fields

Track Daily Safety Topic, All-Hands Safety Topic, Safety Topic Attendees, Site Orientations Given, and more

Environmental

18 fields

Track SWPPP / Erosion Control Inspection Completed, SPCC (Spill Prevention) Inspection Completed, Erosion Control Measures Status, Species at Risk (SARA/SOCI) Observations, and more

Quality

22 fields

Track Inspections Conducted, Inspections Passed, Inspections Failed, Drawing Revision Tracking, and more

Issues / Delays & Impacts

17 fields

Track Issue Source, Issue Description, Issue Date Identified, Notice to Owner Issued, and more

Photos (Required Documentation)

13 fields

Track Weather Board Photo, Crew / Tailgate Meeting Photo, Civil / Roads Progress Photos, Foundation Progress Photos, and more

Schedule Tracking (3-Day Rolling)

19 fields

Track Yesterday - Actual Work Completed, Today - Planned Work, Tomorrow - Forecast Work, Activity - JTD (Job To Date), and more

Commissioning Tracking

24 fields

Track 34.5kV / Collection System Commissioning, 34.5kV Breakers Tested, 34.5kV Switches Tested, 34.5kV Instrument Transformers Tested, and more

Laydown Yard Tracking

15 fields

Track Laydown Yard ID / Name, Laydown Area (m² / SF), Mobilization, Silt Fence Installed, and more

Site Visitors

5 fields

Track Visitor Name, Visitor Company / Organization, Visitor Purpose, Visitor Sign-In Time, and more

Why This Template Is Different

Built by construction professionals who understand Onshore Wind Farm projects.

This Template vs Generic

Fields
20–30285
Industry-specific sections
NoYes
Compliance coverage
BasicOSHA 1926, FAA Part 77, NFPA 70E, NEC, NERC
Role variants
15
Formats
Excel onlySheets, Excel, PDF, HTML
Cost
FreeFree

Onshore Wind Farm-Specific Features

OSHA 1926, FAA Part 77, NFPA 70E, NEC, NERC compliance fields built in
22 sections tailored to Onshore Wind Farm workflows
Every field mapped to a safety or performance metric
5 role variants: Superintendent, Foreman, PM, Safety, QC

This template has 285 fields. Generic templates have 20-30.

That's 11x more coverage for Onshore Wind Farm projects.

By Hand, This Takes 45 Minutes.

POD reads the files you already produce into your report and dashboard, then tracks your project as new files come in.

Before

Manual template

Open spreadsheet, type 285 fields
45 minutes per report
Static document with no insights
Copy-paste to distribute
No trend tracking or alerts

After

AI-powered Plan of Day

Upload the files you already produce
POD reads them into your report and dashboard
Your project metrics tracked automatically
AI insights for safety, budget, and schedule risks
Share it with your whole team instantly

What a Wind Farm Daily Has to Capture

A utility-scale onshore wind site is not a building. It is a hundred square miles of gravel road, thirty or more pads spread across ranch land, and a critical path that runs on the wind forecast instead of the calendar. The daily report that works here reads like the crane superintendent wrote it: the day starts with the met-mast readout and the picking window, not with headcount.

Generic templates have one line for weather. On a wind build, the ten-minute average and the gust at hub height decide whether a blade goes up today, and the owner will ask why pad 17 sat with a nacelle on the ground for four days. The report has to answer that from its own pages.

Oversize Deliveries

Blade, nacelle, and tower-section loads by permit number, escort count, route, arrival time, and any laydown or turnout that was blocked on the haul road.

Access Roads and Civil

Linear feet of road built to crane-walk spec, crane-pad compaction results, and culvert and crossing installs, since every downstream phase moves on these roads.

Foundations

Mat pour volume and truck count per pad, slump and cylinder sets, anchor-bolt cage survey, and post-cure bolt tensioning with the torque or elongation values recorded per bolt.

Underground Collection

Trench footage, conductor pulled by circuit, splice and termination counts, and energization status per string so nobody digs into a live 34.5 kV run.

Overhead Line and Substation

Structure sets, conductor stringing spans, transformer delivery and oil fill, relay and protection testing, and the NERC and utility witness points reached.

Turbine Erection

Main-crane pick log by pad: base, mid, and top tower sections, nacelle, hub, then each blade, with the recorded wind speed and the assist-crane tailing every lift.

Tower Flange Bolts

Tension records at every flange joint, the percentage checked, the tool calibration on file, and any re-tension on a joint that failed first pass.

Grounding and Earthing

Grounding ring and rod installs per foundation, fall-of-potential or clamp readings, and bonding tie-ins across the collection system as circuits close.

Met Mast and Lighting

Wind data continuity for the resource record, plus FAA Part 77 obstruction lighting status on every completed tower before the crane walks off the pad.

The Regulations That Shape It

OSHA 1926 Subpart CC sets the crane rules, including the wind-speed determination the operator signs before the first pick. FAA Part 77 governs the obstruction lighting that has to be lit and logged on every tower above 200 feet. NEC and NFPA 70E drive the arc-flash boundaries and lockout on collection terminations, and NERC compliance follows the substation from the first relay test to the interconnection date. Each of these leaves a record the daily report is expected to hold.

Hazards You Will Not Find on a Vertical Site

The blade pick is the one that gets people hurt. A single blade over 60 meters long behaves like a wing, and the manufacturer limit for the lift is often under 10 meters per second at the tip. The report has to show the reading that opened the window, the reading at the moment of the pick, and who called it. If the wind rose mid-lift and the crew stood down with the blade in the air, that belongs on the page in the operator's own words.

Behind that sits work at hub height with rescue kits staged per tower, a 300-foot oversize load crossing a county road at dawn, and an underground collection system that is energized string by string while trenching continues one pad over. Each is its own line in the daily, not a checkbox.

Frequently Asked Questions

A comprehensive Onshore Wind Farm Plan of Day (POD) should include these sections: Project Header, Weather Delay Tracking, Deliveries & Materials, Civil / Roads, Foundations, Overhead Line (OHL) / Collector Line, Underground Electrical / MV Collection, Substation, Turbine Erection, Grounding, O&M Building, Manpower, Equipment on Site, Safety / HSE, Environmental, Quality, Issues / Delays & Impacts, Photos (Required Documentation), Schedule Tracking (3-Day Rolling), Commissioning Tracking, Laydown Yard Tracking, Site Visitors. This template covers all of them with industry-specific fields tailored to Onshore Wind Farm construction workflows. It also addresses OSHA 1926, FAA Part 77, NFPA 70E, NEC, NERC compliance requirements.

This Onshore Wind Farm POD template has 285 industry-specific fields organized across 22 sections. That is significantly more than generic construction templates which typically have 20-30 fields. Every field was designed by construction professionals who understand Onshore Wind Farm project requirements.

The HTML version is free — enter your name, email, and company and download it instantly. It covers all 285 fields across 22 sections. The editable Excel, Google Sheets, and fillable PDF versions are included with a POD subscription, and the 14-day trial counts.

Get Your Free Onshore Wind Farm Template