Build Runways.
Not Paperwork.
The Challenge
FAA-mandated logs take hours to compile
Runway closures, NOTAM coordination, phasing plans, and daily diaries must meet FAA Advisory Circular standards. Your superintendent spends 90 minutes after every shift compiling paperwork instead of managing the next phase.
Multiple agencies require separate documentation
FAA, TSA, airport authority, and the airlines each want different report formats. The same pour gets documented four different ways for four different reviewers.
Active runway adjacency creates constant safety risk
Construction zones inches from active taxiways and runways demand real-time safety documentation. A missed safety log near a live runway is not just a compliance gap, it is a potential catastrophe.
Night shift handoffs lose critical context
Airport construction runs 24/7 with tight windows. When the night crew hands off to the day crew, details about FOD sweeps, barricade placements, and phasing changes get lost in verbal summaries.
The POD Advantage
Voice-First Daily Diaries
Speak your daily update while walking the airfield. POD captures crew counts, runway closures, NOTAM references, phasing status, and safety observations from natural speech.
FAA-Compliant Documentation
Reports auto-format to FAA Advisory Circular standards with all required fields. NOTAM references, phasing documentation, and FOD sweep logs are structured for immediate submission.
GPS-Tagged Airfield Photos
Snap photos of barricade placements, pavement sections, and active zones. POD auto-tags with GPS coordinates, timestamps, and links them to the daily report for instant traceability.
24/7 Shift Continuity
Night shift reports feed directly into day shift dashboards. Every crew member sees what happened, what changed, and what needs attention before stepping onto the airfield.
Key Features
Industry-Specific KPIs That Update Themselves
POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.
Safety Performance
Earned Value Performance
Both cost and schedule under pressure
These update in real time from a 5-minute voice report. No spreadsheets. No data entry.
Frequently Asked Questions
Ready to See POD on the Airfield?
Watch a runway rehabilitation project documented in real time.