FOD Prevention

Foreign Object Debris Causes
$4 Billion in Damage Annually

$0B
B Annual FOD Damage Worldwide
0%
% FOD From Construction Activity
0
Tool Checks Per Crew Per Day
0
Min With POD

The Challenge

01

FOD sweep records do not prove coverage

FOD sweeps are required before and after every shift on airside construction. Paper sign-off sheets prove someone signed a form, not that every square foot of the work zone was actually swept and inspected.

02

Tool accountability relies on manual counts

Every tool brought airside must be inventoried and accounted for at shift end. Paper tool lists with manual checkmarks miss tools that were not on the original list — borrowed tools, replacement parts, and consumables.

03

Material containment is visually inspected only

Construction materials airside must be secured against jet blast and prop wash. Visual inspections happen but documentation of containment measures is rarely completed until an incident occurs.

04

FOD incident reporting is after the fact

When FOD is found on a taxiway or runway, the investigation traces it back to construction. Paper records cannot show which crew was working in which zone at the time the debris appeared.

The POD Advantage

Voice-logged FOD sweep verification

GPS-verified sweep coverage

Walk the FOD sweep route and voice-report findings as you go. POD GPS-tracks the sweep path and logs every item found, creating a coverage map that proves complete zone inspection.

Digital tool check-in and check-out

Real-time tool accountability

Every tool scanned or voice-logged at shift start and shift end. POD flags missing tools immediately so searches begin while crews are still on site, not after they have left the airfield.

Material containment documentation

Documented containment proof

Photo-document containment measures for every material storage area airside. POD timestamps and geolocates containment verification so inspectors can confirm compliance without walking every zone.

Crew zone tracking for incident tracing

Instant incident tracing

POD tracks which crews worked in which zones and at what times. When FOD is discovered, the system identifies the crew and timeframe responsible within seconds.

FOD Prevention Intelligence

“We had 14 construction crews working airside simultaneously. One crew lost a box cutter blade during roofing work. It took 4 hours to find it. That single blade grounded 6 departures. Now every tool gets checked in and checked out with POD.”

— Construction Safety Director, Major Hub Airport Expansion

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.