Runway Phasing

Runway Phasing Plans Have
Up to 47 Construction Phases

0
Max Phases Per Runway Project
$0K
K Per Day Revenue Loss if Delayed
0%
% Phase Transitions Documented Late
0
Min With POD

The Challenge

01

CSPP phase transitions not verified in real time

Construction Safety Phasing Plans define exactly what must happen before aircraft can use a runway segment. Paper-based phase transition checklists are completed hours after the actual transition, not during it.

02

Temporary marking documentation falls behind

Temporary runway markings, hold position signs, and closure markers must be placed and removed at exact times during phase transitions. Paper logs cannot prove the exact time a marking was placed or removed.

03

NAVAID protection zones poorly tracked

Navigation aids near construction require protection zones — critical height surfaces, signal interference boundaries, and equipment clearance areas. Paper tracking of NAVAID protection compliance is inconsistent.

04

Barricade placement records are incomplete

Construction barricades and lighted markers must be placed at specific locations defined in the CSPP. Paper placement logs record that barricades were deployed but not their exact GPS positions relative to requirements.

The POD Advantage

Voice-verified phase transitions

Time-stamped phase verification

Walk the phase transition checklist and voice-confirm each item as it is completed. POD timestamps every verification step so FAA inspectors can see exactly when each phase element was completed.

Photo-documented temporary markings

Visual marking verification

Every temporary marking placement and removal documented with photos, GPS coordinates, and timestamps. POD creates a visual record proving markings matched CSPP requirements at every phase transition.

NAVAID protection zone monitoring

Automated NAVAID protection

Protection zone boundaries mapped against construction activities. POD alerts when equipment heights or material stockpiles approach NAVAID critical surfaces.

Barricade position verification

GPS-verified barricade placement

GPS-verified barricade placement compared against CSPP requirements. POD confirms every barricade is in the correct position before phase transition approval is requested.

Runway Phasing Intelligence

“We missed documenting a temporary marking removal during a phase transition. The FAA inspector found the discrepancy during a spot check and we lost 8 hours of paving time while they verified the entire phasing plan was correct. That cost us $120,000 in liquidated damages.”

— Project Director, Runway Rehabilitation Program

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.