BESS Commissioning Checklists

Every Checklist. Every Sign-off.
Digitized and Tracked.

The Challenge

01

Paper checklists slow down commissioning

Hundreds of checklist items per container. Paper forms create bottlenecks when multiple parties need to review and sign off.

02

Sign-offs require physical presence

Engineers wait for inspectors. Inspectors wait for documentation. Physical sign-off requirements create scheduling nightmares.

03

Missing checklist items discovered at handover

Incomplete checklists surface during project handover, forcing rework and delaying energization.

04

No visibility into completion status across containers

With dozens of containers being commissioned, knowing which are complete, which are pending, and which have issues requires manual tracking.

The POD Advantage

Digital Checklist Platform

Faster completion

All commissioning checklists on mobile devices. Check items, attach photos, and add notes from the field.

Remote Multi-Party Sign-off

Eliminate scheduling delays

Engineers, inspectors, and managers sign off digitally from anywhere. No more waiting for physical presence.

Real-Time Completion Tracking

Full visibility

See which containers are complete, which have open items, and which are blocked. All in one dashboard.

Photo Verification on Every Item

Documented proof

Attach photos to checklist items as proof of completion. Visual evidence for every sign-off.

Key Features

“We cut commissioning time by 30% just by eliminating the paper checklist bottleneck.”

— Commissioning Lead, 250 MWh BESS Project

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.