Build Smarter.
Report Faster.
The Challenge
Superintendents lose 45 minutes every evening to paperwork
After managing a 200-person commercial site all day, your superintendent sits in a trailer for 45 minutes filling out daily logs, safety checklists, and progress reports. That is unpaid overtime on every project.
GC daily log requirements vary by owner
Every building owner wants different information in different formats. One wants weather and crew counts, another wants progress photos with annotations, a third wants detailed equipment logs. Your team reformats the same data repeatedly.
Multi-floor coordination gaps create rework
When the drywall crew on floor 12 does not know the electrical rough-in on floor 11 is incomplete, they hang board over open boxes. That is a $50,000 rework event that a daily report should have prevented.
Subcontractor daily reports are inconsistent or missing
You have 30 subs on a commercial high-rise. Maybe 10 submit daily reports. The other 20 give you verbal updates that never make it into the project record. When a dispute arises, there is no documentation.
The POD Advantage
Voice-First Daily Reports
Your superintendent speaks the daily update while walking the building. Floor-by-floor progress, crew counts by trade, safety observations, and coordination issues all captured in 60 seconds.
Auto-Formatted for Any Owner
One voice report generates daily logs in any format your owner requires. LEED documentation, safety metrics, progress summaries, and photo logs all produced from the same input.
Floor-by-Floor Photo Documentation
Tag photos by floor, zone, and trade. POD organizes them into a visual progress record that owners, architects, and inspectors can review without a site visit.
Subcontractor Accountability Dashboard
See which subs reported, which did not, and what their daily progress looks like. Auto-flag coordination conflicts between trades before they become rework.
Key Features
Industry-Specific KPIs That Update Themselves
POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.
Safety Performance
Earned Value Performance
Both cost and schedule under pressure
These update in real time from a 5-minute voice report. No spreadsheets. No data entry.
Frequently Asked Questions
Ready to See POD in Action?
Watch a 270-day project unfold in 30 seconds.