Ready-Mix Quality

Batch Plant Records Are
The Weakest Link in Concrete QC

0
Loads Per Typical Pour Day
0%
% Loads With Spec Deviations
0
Rejected Loads Per 100
0
Min QC Check With POD

The Challenge

01

Batch ticket data stays at the plant

The plant prints tickets with mix design, batch time, water added, and admixtures. But this data sits on paper tickets that the driver hands to the crew. Nobody digitizes it or analyzes it.

02

Mix design deviations go unnoticed

The plant batches mix 4500-3/4 instead of the specified 5000-3/4. The batch ticket shows it but nobody on site reads the mix design line. The wrong concrete goes in the structure.

03

Load time compliance is not tracked

Concrete has to be placed within 90 minutes of batching. But nobody calculates batch time to placement time per load. Over-time concrete gets placed because nobody caught it.

04

Seasonal adjustments are undocumented

Hot weather pours need ice or retarder. Cold weather pours need hot water or accelerator. The plant makes adjustments but the documentation trail is weak.

The POD Advantage

Voice-captured ticket verification

Mix design verified

Read each batch ticket aloud as the truck arrives. POD verifies the mix design against the approved spec and flags any deviations before the load is placed.

Automatic load time tracking

No expired loads

POD calculates batch-to-placement time for every load. Loads approaching the 90-minute limit trigger alerts before the concrete expires.

Field test result logging

Spec compliance

Slump, air content, temperature, and unit weight results logged per load. Results compared to spec limits with instant pass/fail indication.

Built for Concrete Quality

“We caught a load with the wrong mix design at the plant gate because POD flagged that ticket 47 did not match our approved mix for the elevated slab. That one catch saved us from a potential structural issue.”

— QC Manager, Ready-Mix Concrete Company

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Connect Your Batch Plant to the Field

See how POD bridges the gap between ready-mix plant data and field quality.

Last updated: February 2026