Formwork & Shoring

Formwork Inspections Happen
But Nobody Can Prove It

0
Formwork Failures/Year US
0
Avg Deaths Per Failure
0%
% Inspections Single-Signature
0
Min Inspection With POD

The Challenge

01

Single signature proves nothing

The pre-pour inspection form has one signature line. That signature says I inspected the forms. It does not say which braces were checked, what the form alignment measured, or where the deficiencies were.

02

Shoring calculations are not field-verified

The shoring design calls for 4x4 posts at 4 foot centers. In the field, the crew sets them at 5 foot centers because the 4 foot spacing does not fit the layout. Nobody catches the deviation.

03

Pre-pour condition is undocumented

What did the forms look like immediately before the pour started? If a form fails during the pour, the pre-pour condition evidence is critical but nobody photographed it.

04

Reshoring removal is uncontrolled

Reshoring needs to stay in place for a specific time based on design loads. But paper tracking of reshoring installation and removal dates is inconsistent at best.

The POD Advantage

Voice-guided inspection walkthrough

Every check recorded

POD guides the inspector through each check: brace spacing, tie spacing, alignment, bracing, and grade. Voice responses document what was actually verified at each point.

Photo evidence of form condition

Visual proof

Photos at each inspection point documenting form condition, bracing, and alignment. Pre-pour visual evidence that survives the pour.

Measurement documentation

Design compliance

Record actual brace spacing, tie spacing, and form dimensions. POD compares field measurements to the shoring design and flags deviations.

Reshoring tracking

Safe reshore removal

Track reshoring installation dates, locations, and planned removal dates. Automated alerts when reshoring removal is scheduled so nothing gets stripped early.

Built for Formwork Safety

“A form blew out on a wall pour because a brace was missed. The pre-pour inspection was signed off but nobody actually checked that corner. With POD every brace location is documented with a photo.”

— Safety Director, Concrete Frame Contractor

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Prove Every Formwork Inspection Was Real

See how POD turns formwork inspections from signatures into documented evidence.

Last updated: February 2026