POD

Commission Faster.
Miss Nothing.

0%
Tests Documented
0
Sec to Log

The Challenge

01

Commissioning test results scattered across vendor reports

UPS load bank tests from one vendor, generator performance from another, cooling system balancing from a third. Assembling a complete commissioning record means chasing reports from a dozen contractors.

02

Test scheduling conflicts delay the commissioning sequence

You cannot run a full load test while the cooling system is being balanced. Sequencing commissioning activities across multiple systems and vendors requires coordination that paper schedules cannot support.

03

Failed tests not communicated to dependent teams

The UPS fails its load bank test on Tuesday. The team planning the IT load migration on Thursday does not find out until Wednesday evening. Every failed test creates a cascade that nobody tracks in real time.

04

Uptime Institute auditors need organized test evidence

Tier III or Tier IV certification requires demonstrating that every system was tested according to specific procedures with documented results. Assembling this evidence from paper records takes weeks.

The POD Advantage

Voice-Logged Test Results

Real-time test logs

Document every commissioning test by voice as it completes. Pass/fail status, measured values, deviations from spec, and required follow-up captured instantly and linked to the commissioning schedule.

Commissioning Sequence Manager

Cascade visibility

Visual commissioning schedule showing dependencies between tests, current status, and cascade impacts of delays or failures. See exactly how a failed test affects the entire sequence.

System Readiness Dashboard

System-level status

Track commissioning completion by system type: power, cooling, fire, network, BMS. See which systems are fully tested, which have open items, and which are blocking go-live.

Uptime Institute Audit Package

Audit-ready package

All commissioning test results, procedures, and evidence organized in the format Uptime Institute auditors require. Generate the complete certification package without weeks of document assembly.

Key Features

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Last updated: February 2026