Energized Environments.
Zero Incidents.
The Challenge
High-voltage work zones create arc flash hazards daily
Data center construction involves live electrical work near energized switchgear. Arc flash boundaries shift as systems come online, and documenting these changes on paper cannot keep pace with reality.
Safety observations documented hours after the fact
Your safety team walks the floor, notes issues on a clipboard, returns to the trailer, and types up observations. By the time the report reaches the foreman, the crew has moved to a different zone.
LOTO verification records incomplete and inconsistent
Lock-out/tag-out procedures in a data center are critical. Paper-based LOTO records have missing signatures, unclear lock numbers, and no photo verification that the correct breakers were actually locked.
Multiple high-risk trades working in confined spaces simultaneously
Electricians, plumbers, HVAC technicians, and cable pullers all work in raised floor spaces and ceiling plenums. Coordinating confined space entries and monitoring atmospheric conditions across trades is a safety nightmare.
The POD Advantage
Real-Time Hazard Mapping
Document arc flash boundaries, confined space entries, and hot work zones by voice. POD maps hazards to facility zones and alerts crews when their work area has active safety restrictions.
Instant Safety Observations
Speak safety observations as you see them. POD classifies severity, assigns follow-up, geo-tags the location, and pushes the observation to the responsible foreman within seconds.
Photo-Verified LOTO Records
Every LOTO event documented with timestamped photos of locked breakers, tag locations, and verification signatures. Complete audit trail from lockout through energy restoration.
Multi-Trade Safety Coordination
See all active confined space entries, hot work permits, and high-voltage clearances in one dashboard. Prevent hazardous overlaps between trades working in the same zones.
Key Features
Industry-Specific KPIs That Update Themselves
POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.
Safety Performance
Earned Value Performance
Both cost and schedule under pressure
These update in real time from a 5-minute voice report. No spreadsheets. No data entry.
Frequently Asked Questions
Ready to See POD in Action?
Watch a 270-day project unfold in 30 seconds.