Quality Assurance

EV Charger Commissioning Has
47 Quality Checkpoints

0
Checkpoints Per Charger
0%
% Chargers Fail First Test
0
Weeks Avg Rework Delay
0
Min With POD

The Challenge

01

Power output testing skipped at installation

Chargers pass electrical inspection but nobody verifies actual power output at each connector. Customers arrive to find chargers delivering half the rated power.

02

Network connectivity tested too late

Cellular or WiFi connectivity is verified weeks after installation. Failed connections mean rolling trucks back to sites at $500 per trip to troubleshoot.

03

ADA compliance checked by different people

Mounting height, reach range, ground slope, and clear floor space requirements checked at different times by different people. Nobody has a single comprehensive ADA record.

04

Signage requirements vary by jurisdiction

ADA signs, EV-only parking signs, rate display signs, and safety labels differ by state and utility. Wrong signage means rework and re-inspection.

The POD Advantage

Voice-guided commissioning checklist

First-time pass rates up 40%

POD walks technicians through every commissioning checkpoint. Power output, network ping, payment terminal test, and connector verification all captured at install time.

Network testing at installation

Zero return trips for network

Connectivity verification built into the install workflow. POD flags communication failures before the crew leaves the site.

ADA compliance verification

Complete ADA records

Comprehensive ADA checklist with measurement fields and photo documentation. One record proves every accessibility requirement was met.

Photo-verified signage compliance

Right signs first time

POD prompts for photos of every required sign with jurisdiction-specific requirements pre-loaded. Catch missing or wrong signs during installation.

Commissioning Quality at Scale

“We commissioned 50 chargers and 14 failed network connectivity testing. Had to roll trucks back to every site. If we had documented the network config during install, we would have caught it same day.”

— Quality Manager, EV Charging Network Operator

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Commission Chargers Right the First Time

See how POD turns 47 quality checkpoints into a guided workflow that catches issues at installation.

Last updated: February 2026