Clear Every Constraint. Then Build.

Lean Construction's Last Planner System has one rule: before you can build, you must clear every constraint. Most teams track constraints in spreadsheets or not at all. POD tracks every constraint, every owner, every deadline — built into your daily report.

0
Avg Constraints Per Week
0%
Start Reliability (Industry Avg)
0%
Start Reliability (With POD)
$0
Cost Per Unresolved RFI

Constraints Don't Announce Themselves

By the time you discover a constraint, it has already cost you a day. Here's what hides in the shadows of every construction schedule.

RFIs blocking work for 12 days on average

Your crew is ready to install. But the design question from two weeks ago still hasn't been answered. $1,080 per RFI, and you have 60 open.

Materials "in transit" with no arrival date

The rebar was supposed to arrive Monday. It's Wednesday. Nobody knows where it is. The formwork crew is standing by at $4,200/day.

Inspections scheduled without prerequisites complete

The inspector arrives at 10am. At 9:55am, your super realizes the beam connections haven't been torqued. Failed inspection. Re-inspection in 5 days.

Constraints tracked in spreadsheets — or not at all

Most teams track constraints in someone's head, in email threads, or in a spreadsheet nobody updates. When constraints hide, schedules slip.

How POD Makes Constraint Removal Automatic

Identify → Assign → Clear. Every day, every constraint, every owner accountable.

01

Identify Constraints Automatically

POD surfaces constraints from daily reports, RFI logs, material tracking, and inspection schedules. No manual tracking needed — the system finds what's blocking you.

02

Assign Owners & Deadlines

Every constraint gets an owner and a deadline. POD tracks accountability and sends alerts when deadlines approach. No more "I thought someone was handling that."

03

Clear Constraints, Start Building

As constraints are cleared, activities become "ready to start." Your daily dashboard shows exactly what can proceed today and what's still blocked.

The Constraint Wall — Remove Bricks, Clear the Path

Every brick is a constraint blocking production. POD removes them one by one, revealing a clear path to progress.

BLOCKEDCannot startRFI #47MaterialPermitDecisionInspectSub CrewDrawingEquipmentCLEARPATH0/8 constraints cleared — 0% ready

Remove the Wall Between Planning and Building

POD brings Last Planner System principles into your daily workflow — no spreadsheets, no manual tracking, no constraints hiding in email threads.

Constraint Dashboard

See every constraint at a glance — type, owner, deadline, and days aging. Filter by critical path impact to focus on what matters most.

Zero hidden constraints

Owner Accountability

Every constraint has a name attached. POD tracks who cleared what, when, and shows historical performance by owner.

No more "I thought you were handling that"

Aging Alerts

Constraints approaching their deadline get amber alerts. Overdue constraints turn red. Critical path constraints get escalated to the PM automatically.

Problems escalate before they damage the schedule

Activity Start Reliability

Track what percentage of activities start on their planned date. Low reliability means constraint removal isn't working — POD shows you why.

Measure what matters: did the work actually start?

Material Critical Path Exposure

Which materials are on the critical path? Which are at risk of delay? POD maps material deliveries to your schedule and flags exposure.

See the material risk before it hits

AI Constraint Prediction

AI agents analyze patterns in your constraint data to predict which activities are likely to be blocked next week — before the constraints even appear.

Predict constraints before they form

12 Constraints. 4 Cleared Yesterday. 8 Remain. Every One Has an Owner.

Activity start reliability and material critical path exposure — the metrics that prove constraints are being managed, not ignored.

Start Reliability

POD
0.0%on-time starts
0/0 on timetarget 85%

Material Critical Path Exposure

POD
$156K exposure
Structural Steel2026-04-150dbuffer$0exposureCRITSwitchgear2026-04-220dbuffer$0exposureRISKConcrete2026-03-280dbuffer$0exposureSAFERebar2026-04-010dbuffer$0exposureSAFE
Critical0
$ Exposure$0
Safe0
1 critical material on critical path with $156K total daily exposure

Lean Construction, Built Into Your Daily Report

Lean Construction Integration

Last Planner System principles built into your daily workflow — constraint identification, make-ready planning, and percent plan complete

Make-Ready Lookahead

Six-week lookahead with constraint status for every activity — see what needs to be cleared and by when

Constraint Ownership Tracking

Every constraint has an owner, a deadline, and a status. Historical data shows which owners are clearing constraints on time

Critical Path Impact Scoring

Not all constraints are equal — POD scores each by its impact on critical path activities and total project float

Predictive Constraint Analysis

AI analyzes patterns to predict which activities will be blocked next week and what constraints are forming

Constraint Type Analytics

See which types of constraints recur most — RFIs, materials, inspections, decisions — and address systemic issues

“We implemented Last Planner three years ago but always struggled with constraint tracking. POD made it automatic. Our percent plan complete went from 54% to 84% in six weeks. Constraints don't hide anymore.”

— Lean Manager, Regional GC

Frequently Asked Questions

Stop Guessing. Start Clearing.

See how POD brings constraint removal into your daily workflow — every constraint tracked, every owner accountable, every deadline visible.