QC Testing

Compaction Test Results
Lost Between Lab and Field

0
Days Avg Result Delay
0%
% Lifts Placed Before Results
0
Tests Per Week Avg
0
Min With POD
“We placed 6 lifts before finding out lift 2 failed compaction. Had to dig it all out. With POD the field tech voice-logs results instantly and failures flag before the next lift goes down.”

— QC Manager, Site Development Contractor

The Challenge

Before POD

×

Results take 3 days

The testing lab emails results 3 days after the test. By then you have placed multiple lifts on material that may have failed. Rework costs 10x the test cost.

×

Lift-by-lift tracking does not exist

Which lift was tested where? Paper logs say lift 3 at station 4+50 but there is no map and no way to connect tests to specific locations.

×

Failing tests get buried in email

A failed compaction test arrives as an email attachment on page 4 of a PDF. Nobody catches it until the inspector asks for the records weeks later.

×

Specification compliance is retroactive

You find out you are out of spec after the fact. The material is already covered. Now you are doing destructive testing to prove what should have been verified in real time.

With POD

Voice-log test results in the field

Field tech speaks the results as they test: station, lift, dry density, moisture content, percent compaction. Results are live before the next lift goes down.

Instant results

Location-linked test records

Every test tied to a specific station, offset, and lift number. Build a compaction map that shows exactly where every test was taken.

Spatial tracking

Failed test alerts

Below-spec compaction result? POD immediately alerts the superintendent and QC manager. No more burying failures in email attachments.

Instant failure alerts

Specification compliance dashboard

See compaction compliance by area, lift, and material type. Know your pass rate in real time, not 3 days later.

Real-time compliance

Compaction Intelligence

Lift-by-Lift Tracking

Every lift documented with location, test results, and material specifications. Complete traceability.

Compaction Map

Visual map of all test locations with pass/fail results. See coverage gaps instantly.

Trend Analysis

Track compaction trends by area and material type. Catch systematic issues before they become rework.

Live Demo

This Is What Real Workforce Intelligence Looks Like

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Headcount Tracker

Workforce Headcount

StableFully Staffed
0%Staffed
Electricians0
Iron Workers0
Operators0
Laborers0
Staffing Trend
ActualPlanned
JanFebMarAprMayJun
Current Headcount
Under plan by 160 Stable
0of 160
Fill Rate
0%
Gap
160short
Peak
158May
Avg Staffing
0of 160 plan
0% filled — fully staffed
Peak: 158 at May
Low: 142 at Jan
PODMomentum Score

Momentum Score

POD
0
Accelerating — Velocity: 0.0
Dimensions
Schedule+0.0
Budget+0.0
Quality0.0
Safety+0.0
Momentum0
Velocity0.0
Accel+0.0
Project accelerating — momentum 78, velocity increasing by 3.0/period

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Stop Placing Lifts on Failed Material

See how POD gives you real-time compaction results before the next lift goes down.

Last updated: February 2026