Hospital & Healthcare Construction

Building Next to Patients.
Zero Disruptions.

0
Active Phases
0
ICRA Reports Filed
0s
Sec Report Time
0%
% Barrier Integrity

The Challenge

01

ICRA compliance is life-or-death

Infection Control Risk Assessment is not optional. Construction dust near immunocompromised patients can be fatal. Documentation must be perfect.

02

Barrier integrity checks happen every shift

Temporary walls, negative pressure systems, and HEPA filtration must be verified constantly. Paper logs create gaps that endanger patients.

03

Phased occupancy means the hospital never closes

Floors are occupied while you build above, below, and beside them. Noise, vibration, and utility shutdowns must be precisely coordinated.

04

Hospital staff, contractors, and patients share space

Construction crews navigate through active hospital corridors. Wayfinding, noise control, and access restrictions change daily.

The POD Advantage

ICRA Barrier Verification

Patient safety assured

Digital barrier integrity checks with photo proof every shift. Automatic alerts if a check is missed or a barrier compromised.

Infection Control Documentation

Accreditation-ready

HEPA filter status, negative pressure readings, and dust monitoring attached to every daily report. Joint Commission ready.

Phased Occupancy Dashboard

Zero patient impact

Track which floors are occupied, under construction, or in transition. Coordinate utility shutdowns without disrupting care.

Multi-Stakeholder Coordination

Everyone aligned

Construction managers, hospital facilities, infection control, and nursing all see the same daily updates.

Healthcare-Specific Features

“We are building an OR suite 30 feet from an active ICU. If a barrier fails and we cannot prove we checked it, we shut down. POD is our proof.”

— Infection Control Coordinator, Level I Trauma Center Expansion

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready to Protect Patients While You Build?

See how POD handles the unique demands of occupied healthcare construction.