Highway Crew Productivity

35 Crews. 480 Workers.
One Productivity Dashboard.

The Challenge

01

Crew output is estimated, not measured

Superintendents guess at daily output. Without accurate production data, you cannot identify bottlenecks or reward top crews.

02

Equipment utilization is unknown

Excavators, pavers, and rollers sit idle for hours. Without tracking, you pay for equipment that is not producing.

03

Headcount changes daily

Crews fluctuate in size based on weather, schedule, and availability. Tracking actual headcount per spread is manual guesswork.

04

Cannot compare crew performance

Is the paving crew on Spread 3 faster than Spread 1? Without standardized data, you cannot compare or improve.

The POD Advantage

Daily Crew Output Tracking

Measure real output

Foremen log production quantities per crew per shift. Tons paved, CY moved, LF installed - all measured and tracked.

Equipment Hour Logging

Maximize utilization

Track equipment hours per machine per day. See utilization rates and identify idle equipment costing you money.

Real-Time Headcount by Spread

Know your workforce

Digital check-in gives you exact headcount per spread, per crew, per shift. No more guessing.

Crew Performance Comparison

Data-driven improvement

Compare production rates across crews and spreads. Identify top performers and share best practices.

Key Features

“We identified a 30% output gap between two paving spreads. Fixing it saved us three weeks on the schedule.”

— Operations Manager, Heavy Highway Contractor

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions