Highway Executive Dashboard

15 Stakeholders. 18,000 Data Points.
One Dashboard.

The Challenge

01

Executives are always asking for updates

DOT officials, owners, and internal leadership all want status updates. Preparing each one takes hours.

02

Data comes from too many sources

Field reports, sub logs, inspection results, and safety data all live in different systems. Compiling them is a full-time job.

03

Reports are stale before they are delivered

By the time you compile data from 5 sources into a slide deck, the numbers are already 48 hours old.

04

Different stakeholders want different views

DOT wants compliance metrics, owners want schedule, and leadership wants budget. One report cannot serve them all.

The POD Advantage

Real-Time Multi-Corridor Dashboard

Always current data

All projects, all corridors, all metrics on one screen. Updated the moment field data is submitted.

Unified Data from Every Source

Single source of truth

Field reports, sub data, inspections, and safety metrics flow into one dashboard automatically. No manual compilation.

10-Second Report Generation

10 seconds, not 10 hours

Generate professional executive reports with one click. Formatted for DOT, owners, or internal leadership.

Role-Based Dashboard Views

Right data, right audience

Each stakeholder sees the metrics they care about. DOT compliance, owner schedule, or leadership financials.

Key Features

“Our DOT liaison used to spend all Monday compiling data. Now she generates the report in 10 seconds and spends Monday actually managing the project.”

— VP of Operations, Heavy Highway Contractor

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Last updated: February 2026