Every Cone. Every Sign.
Documented and Compliant.
The Challenge
Work zone setups are not documented
Crews set up traffic control every day but rarely document the actual layout. When something goes wrong, there is no record.
MUTCD compliance is hard to prove
The Manual on Uniform Traffic Control Devices requires specific setups. Proving compliance after the fact is nearly impossible.
Night work adds safety complexity
Night shifts require additional lighting, signage, and safety measures. Documentation is even harder in the dark.
Safety audits reveal gaps too late
Internal audits discover documentation gaps weeks after the work happened. By then, reconstruction of records is unreliable.
The POD Advantage
Digital Work Zone Plans
Create and document work zone layouts on a mobile device. Photo-verify setup matches plan before work begins.
Traffic Control Logging
Log every traffic control device placement, modification, and removal. Timestamped and GPS-verified.
Night Shift Documentation
Specialized night work templates capture lighting levels, reflective signage, and enhanced safety measures.
Continuous Safety Audits
POD flags documentation gaps in real time so you fix them before auditors find them.
Key Features
“We went from dreading safety audits to welcoming them. Every work zone setup is documented with photos and GPS.”
— Traffic Control Manager, DOT Prime Contractor
Industry-Specific KPIs That Update Themselves
POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.
Safety Performance
Earned Value Performance
Both cost and schedule under pressure
These update in real time from a 5-minute voice report. No spreadsheets. No data entry.
Frequently Asked Questions
Ready to Transform Your Reporting?
Join thousands of construction professionals using POD.