Power Plant Construction

Megawatts of Progress.
Reported Daily.

0
MW Capacity
0
Weld Records
0%
% NDE Pass Rate
0s
Sec Report Time

The Challenge

01

Weld tracking complexity across contractors

Thousands of welds across boiler, piping, and structural steel. Each contractor tracks welds differently. Consolidating weld data for NDE scheduling is a daily battle.

02

NDE documentation gaps create rework

Missed NDE inspections mean cutting out and re-welding completed joints. The documentation burden of tracking which welds need which NDE method is enormous.

03

Multi-trade coordination in confined spaces

Boilermakers, pipefitters, electricians, and insulators all work in tight spaces. Coordinating access and sequencing requires constant communication.

04

Commissioning sequence dependencies

System turnover requires precise sequencing. A missed punch item on one system can block commissioning of downstream systems for weeks.

The POD Advantage

Unified Weld Log

One weld dashboard

All contractor weld data flows into one dashboard. Track welder qualifications, joint numbers, NDE status, and repair rates across every contractor.

NDE Tracking

Zero missed NDE

Automated NDE scheduling based on weld completion. Every joint knows which NDE method it needs and whether it has been inspected.

Trade Coordination

No trade conflicts

Area-based daily reports show which trades are working where. Identify conflicts before they cause standby time.

Commissioning Tracking

Turnover visibility

System-by-system punch list and turnover tracking. See exactly which systems are ready for commissioning.

Power Plant Features

“Our quality team spent 4 hours each day reconciling weld logs across 8 contractors. POD consolidated everything into one dashboard automatically.”

— Quality Manager, Combined Cycle Power Plant

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready for Power Plant Intelligence?

See how POD manages weld logs, NDE, and commissioning in one platform.

Last updated: February 2026