POD

Every Level. Every Shift.
One Report.

0
Min Saved Per Shift
0%
MSHA Ready
0
KPIs Tracked

The Challenge

01

Underground shift reports take 90 minutes to compile

After an 8-hour shift underground, your foreman spends another 90 minutes documenting ground conditions, ventilation readings, equipment status, and production quantities. Most of that time is reformatting the same data for different audiences.

02

MSHA Part 46/48 training documentation scattered

MSHA requires specific training documentation for every miner. Records are split between the safety office, the training coordinator, and individual foremen. When an MSHA inspector asks for records, finding them is a scramble.

03

Ground condition changes not communicated between shifts

The day shift notices a new crack in the heading. The note goes in their report, which the night shift foreman does not read before heading underground. Critical ground condition changes get lost in shift transitions.

04

Production numbers disputed between contractor and owner

Your daily production report says 450 tons. The owners scale tickets say 430 tons. Without real-time tracking at the face, every production reconciliation becomes a negotiation.

The POD Advantage

Voice Reports from Underground

Report while traveling

Speak your shift report while heading to surface. Ground conditions, ventilation readings, production quantities, equipment status, and safety observations captured in natural speech.

MSHA Compliance Tracking

MSHA audit-ready

Part 46/48 training records, workplace examination logs, and hazard assessments tracked in one system. When MSHA arrives, your documentation is organized, complete, and instantly accessible.

Shift-to-Shift Handoff System

Zero-gap handoffs

Night shift sees exactly what day shift documented before heading underground. Ground condition changes, equipment issues, and safety observations highlighted and acknowledged before work begins.

Real-Time Production Dashboard

Daily reconciliation

Production quantities tracked from the face through haulage to the scale. Reconcile contractor and owner numbers daily instead of monthly. Resolve discrepancies when memories are fresh.

Built for Mining

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Last updated: February 2026