Modular Construction

Modular Daily Reports Track
Factory, Transport, and Field

0
Locations Tracked Daily
0
Modules Set Per Week Avg
0%
% Reports Miss Factory Data
0
Min With POD

The Challenge

01

Factory production status invisible to field team

Modules being built 500 miles away in a factory have their own production schedule. The field PM has no daily visibility into which modules are on track and which are behind.

02

Transport and delivery tracking is manual

Modules on flatbeds across the country tracked by phone calls to trucking companies. Arrival times, route delays, and delivery sequence changes communicated verbally.

03

Site staging and set sequence documentation poor

Modules must arrive in set sequence and stage in specific locations. When deliveries arrive out of order, the staging plan changes but the documentation does not.

04

Crane pick data not captured systematically

Each crane pick — module ID, pick time, set time, alignment status — needs documentation. Paper logs capture picks completed but not the data engineers need for scheduling.

The POD Advantage

Voice reports from factory and field

Full pipeline visibility

Factory production managers and field superintendents both speak daily reports into POD. One dashboard shows production, shipping, and installation status together.

Module shipping tracker

Delivery predictability

Track every module from factory departure through site arrival. ETAs, route status, and delivery sequence visible to the field team in real time.

Set sequence management

Sequence compliance

Document each crane pick with module ID, set location, alignment verification, and connection status. POD tracks the set sequence against the installation plan.

Production curve tracking

Bottleneck detection

Factory production rate, shipping throughput, and field installation rate tracked together. Spot bottlenecks before they cascade into schedule delays.

End-to-End Modular Reporting

“Our PM tracked field progress but had no visibility into factory production. When modules arrived 3 weeks late, the daily reports showed no warning signs because factory data was not in our reporting system.”

— Operations Director, Modular Building Manufacturer

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Track Modules From Factory to Final Connection

See how POD creates one daily report that spans factory, transport, and field operations.