Modular & Prefab Construction

Factory Floor. Job Site.
One Platform.

0
Modules Tracked
0
Daily Reports
0s
Sec Report Time
0
Factory + Site

The Challenge

01

Factory and field operate in silos

Production reports from the factory and progress reports from the site live in different systems. Nobody has the full picture.

02

Module status tracking is a nightmare

Is Module 23B in fabrication, QC hold, transport, or set? Tracking 60+ modules through 8 stages manually is impossible.

03

Transport logistics create scheduling chaos

Wide loads, permits, weather delays — one late truck can cascade into days of crane downtime on site.

04

Quality defects discovered at set are catastrophic

A defect found 500 miles from the factory means rework on site at 3x the cost. QC documentation must travel with the module.

The POD Advantage

Unified Factory + Site Dashboard

Complete visibility

One dashboard shows fabrication progress, transport status, and site installation. Factory and field are finally connected.

Module Status Tracker

Know every module

Every module tracked through fabrication, QC, transport, staging, set, and close-out. Visual pipeline view.

QC Records Travel with the Module

Quality assured

Quality records, inspection photos, and test results attached to each module. Available on site before the crane arrives.

Cross-Location Coordination

Factory to field sync

Factory foremen, transport coordinators, and site superintendents all report into the same timeline.

Modular-Specific Features

“We fabricate in Ohio and set in New York. Before POD, factory and field were two different planets. Now they share one dashboard.”

— VP of Operations, National Modular Contractor

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready to Connect Factory and Field?

See how POD unifies modular construction from assembly line to close-out.