Modular QC

Factory QC and Field QC
Are Two Different Worlds

0%
% Modules Need Field Rework
0
Connection Points Per Module
0mm
mm Tolerance for Connections
0
Min With POD

The Challenge

01

Factory QC reports are standalone documents

The factory sends a QC package with each module. Paper reports sit in a box that ships with the module. By the time the field crew needs them, nobody can find them.

02

Dimensional tolerances not verified at field connections

Each module meets factory tolerances individually. But when two modules connect, cumulative tolerances stack up. Paper inspection cannot track dimensional drift across 40 modules.

03

Transport damage undocumented between factory and site

Modules travel hundreds of miles on flatbeds. Damage that happens in transit gets discovered during set but nobody can prove when or where it occurred.

04

Connection completion records are incomplete

Mechanical, electrical, plumbing, and fire protection connections at every module joint need individual verification. Paper checklists for 8 connection types across 40 modules become unmanageable.

The POD Advantage

Voice-logged field inspections

Factory-to-field traceability

Inspect each module connection and speak the results — dimensional check, alignment, weather seal, utility connections. POD links field data to the factory QC package for that module.

Dimensional tolerance tracking

Tolerance drift visibility

Record actual dimensions at every connection point. POD calculates cumulative tolerance drift across the building and flags connections approaching limits.

Pre-set and post-set photo documentation

Transport damage evidence

Photo documentation of every module before crane pick and after placement. Visual evidence of condition at each stage proves when damage occurred.

Connection completion matrix

Complete connection status

Every connection type at every module joint tracked to completion — structural, MEP, fire protection, and weather seal. Know exactly which connections are done and which remain.

Modular Quality Assurance

“The factory QC report said every module passed. When we started setting them, 12 out of 40 had connection issues. Factory tolerances did not account for transport deflection. POD would have linked factory and field QC data.”

— Quality Manager, Modular Construction Company

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Bridge the Factory-to-Field Quality Gap

See how POD unifies modular quality control from factory inspection to final connection.

Last updated: February 2026