Module Logistics

Moving 70-Foot Modules on Highways
Requires Military Precision

0
Permits Per Multi-State Move
0
Weeks Lead Time Avg
0%
% Deliveries Arrive Late
0
Min With POD

The Challenge

01

Permit tracking across states is manual

Each state has different oversize load permits, travel time restrictions, and escort requirements. Tracking 14 permits for a single module delivery across 3 states lives in email and spreadsheets.

02

Route surveys become outdated

Bridge heights, utility line clearances, and road conditions change. A route survey done 6 months ago may not account for new construction or temporary restrictions.

03

Delivery scheduling disconnected from site readiness

Modules arriving before the crane is mobilized or the staging area is prepared. Delivery schedules made weeks ago do not reflect current site conditions.

04

Storage yard tracking is ad hoc

Modules staged off-site in storage yards waiting for set sequence. Which modules are where, in what condition, and in what access order is tracked on paper or not at all.

The POD Advantage

Permit management dashboard

All permits in one place

Every oversize load permit tracked by state with application dates, approval status, travel window restrictions, and expiration dates. No more chasing paperwork.

Route survey documentation

Current route data

Route surveys linked to specific module dimensions. When module specs change, POD flags which route surveys need updating for the new dimensions.

Voice-reported delivery coordination

Real-time delivery tracking

Drivers, escorts, and site teams speak updates as delivery progresses. ETA changes, route detours, and arrival confirmation captured in real time.

Storage yard management

Yard inventory control

Every module in every storage yard tracked with location, condition, and scheduled set date. Know exactly which modules are available and which need to ship.

Module Logistics Intelligence

“A module got stuck under a bridge because the route survey was done for a different module height. Three hours on a state highway with police escort. We needed 2 inches of clearance we did not have.”

— Logistics Manager, Modular Building Company

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Control Module Logistics End to End

See how POD coordinates module transport from factory shipping dock to construction crane.