POD

Every System. Every Shift.
One Certified Record.

0
Min Saved Daily
0%
NQA-1 Compliant
0%
Traceability

The Challenge

01

NQA-1 documentation requirements consume 3 hours daily

Nuclear construction under NQA-1 demands exhaustive documentation. Every material receipt, every weld, every concrete placement requires quality records that trace from design through installation. Your QC staff spends more time writing than inspecting.

02

NRC audit trail requirements exceed standard construction documentation

The Nuclear Regulatory Commission requires complete traceability for safety-related components. Material certifications, inspection records, and non-conformance reports must form an unbroken chain from manufacturer to installed location.

03

Radiation protection zone documentation gaps

Workers entering and exiting radiation controlled areas must have documented dosimetry, training verification, and work authorization. Paper-based tracking cannot provide real-time verification or historical completeness.

04

Multi-discipline coordination critical for nuclear safety systems

Pipe, electrical, structural, and instrumentation trades install safety-related systems that must function together. A coordination gap between trades in a nuclear facility is not just rework, it is a safety concern.

The POD Advantage

Voice-First QA/QC Documentation

NQA-1 formatted

Document material receipts, weld inspections, concrete placements, and NDE results by voice. POD formats entries to NQA-1 standards with complete traceability fields.

NRC Audit Trail System

Complete traceability

Complete material and installation traceability from manufacturer through final inspection. Every record linked, every gap flagged, every non-conformance tracked through resolution.

Radiation Zone Management

Zone compliance

Track worker entries, exits, dosimetry, and authorization for all controlled areas. Real-time verification ensures no worker enters without current training and proper dosimetry.

Multi-Discipline Coordination View

Trade coordination

See all safety-related system installation progress across trades. Identify coordination conflicts before they result in non-conformances that require NRC notification.

Key Features

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready for NRC-Ready Reporting?

See how POD compiles a complete daily plant status in under 3 minutes.

Last updated: February 2026