POD

Zero Bypassed Hold Points.
Ever.

0
Criteria Tracked
0%
Traceability
0
Min Record Lookup

The Challenge

01

10 CFR 50 Appendix B creates 18 quality criteria to document

Nuclear QA programs under 10 CFR 50 Appendix B have 18 criteria covering everything from design control to quality records. Documenting compliance across all 18 criteria generates thousands of records per project.

02

Non-conformance reports require immediate containment and tracking

A non-conformance on a safety-related component requires immediate containment, root cause analysis, and corrective action tracking. Paper-based NCR systems cannot provide the speed or traceability that nuclear QA demands.

03

Traceability gaps discovered during NRC inspections

An NRC inspector asks to see the complete quality record for a specific weld. Tracing from the WPS through the PQR, filler metal CMTR, welder qualification, and NDE report takes hours when records are in different systems.

04

Vendor QA programs not integrated with site QA

Equipment arrives with vendor quality records in formats that do not match your site QA system. Reconciling vendor documentation with your Appendix B program requirements is a manual, error-prone process.

The POD Advantage

Appendix B Compliance Matrix

18 criteria covered

All 18 quality criteria mapped to your project activities and documentation. Real-time compliance status shows which criteria are fully documented, which have gaps, and what records are needed.

Voice-Based NCR System

Instant NCR capture

Report non-conformances by voice the moment they are discovered. POD captures the condition, initiates containment, assigns root cause analysis, and tracks corrective actions through completion.

Complete Record Traceability

Minutes, not hours

From design specification through material certification, installation inspection, and final NDE, every record linked in one searchable system. Pull the complete quality record for any component in minutes.

Vendor QA Integration

Pre-install verification

Vendor quality records automatically mapped to your Appendix B program requirements. Identify documentation gaps before equipment is installed, not during the NRC inspection.

Key Features

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

See Appendix B Compliance in Action

Watch POD enforce hold points and auto-generate NCRs in real time.

Last updated: February 2026