Station to Station.
Mile by Mile.
The Challenge
Weld counts reconciled monthly, not daily
Your pipeline project tracks progress by weld count. The field says 847 welds complete. The office count from inspection records shows 831. The 16-weld discrepancy takes three days to reconcile because nobody tracked it daily.
Station-to-station progress not visualized
Progress on a 100-mile pipeline is reported as a percentage. But which sections are complete and which are behind? Without station-to-station visibility, the 78 percent complete number hides critical gaps.
Material deliveries not correlated with installation rates
Pipe is being delivered faster than it is being installed. Pipe is stored on the ROW, exposed to weather, accumulating laydown management costs. Without daily correlation, the disconnect is invisible.
Spread superintendent reports do not roll up consistently
Spread 1 reports in linear feet, Spread 2 in stations, and Spread 3 in weld counts. Rolling up progress across all spreads requires manual conversion that introduces errors and delays.
The POD Advantage
Daily Progress by Voice
Report weld counts, footage installed, stations completed, and quantities placed by voice. POD normalizes all units and calculates progress across all spreads consistently.
Station-to-Station Progress Map
Visual pipeline map showing completion status by station. See exactly which sections are complete, in progress, and not started. Identify the actual critical path geographically.
Material vs. Installation Tracking
Track material deliveries against installation rates daily. Identify when pipe is accumulating on the ROW faster than it is being installed and adjust delivery schedules.
Enterprise Roll-Up Dashboard
All spread progress normalized and rolled up into a single enterprise view. See total project progress with drill-down to individual spread and activity detail.
Key Features
Industry-Specific KPIs That Update Themselves
POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.
Safety Performance
Earned Value Performance
Both cost and schedule under pressure
These update in real time from a 5-minute voice report. No spreadsheets. No data entry.
Frequently Asked Questions
Ready to See POD in Action?
Watch a 270-day project unfold in 30 seconds.