POD

Every Weld.
Every Detail.

0%
Welds Tracked
0
Min Traceability
0
WPS Managed

The Challenge

01

Weld logs maintained in paper notebooks that get lost

Your welding inspector maintains a field notebook with weld numbers, welder IDs, WPS references, and NDE results. That notebook rides in the truck for 6 months. If it gets lost, damaged, or wet, months of weld records are gone.

02

Weld traceability from WPS to NDE takes hours to reconstruct

An auditor asks to see the complete quality record for Weld #4,521. Tracing from the WPS through the PQR, filler metal CMTRs, welder qualification, fit-up inspection, and NDE report takes half a day.

03

Welder qualification expiration not tracked in real time

A welder qualification expires on March 15. Nobody notices until March 22 when the inspector catches it. Every weld made by that welder for the past week is now a non-conformance requiring disposition.

04

Multiple welding procedures across different pipe specifications

Your project has 6 different pipe specifications requiring 12 different WPSs. Ensuring each welder is qualified for the specific WPS they are using, at the specific station, is a tracking nightmare.

The POD Advantage

Voice-Based Weld Logging

Permanent records

Log each weld by voice: weld number, welder ID, WPS, location, filler metal heat number, and fit-up dimensions. POD creates a permanent digital weld log that cannot be lost or damaged.

Complete Weld Traceability

2-minute traceability

Pull the entire quality record for any weld in under 2 minutes. WPS, PQR, CMTR, welder qualification, fit-up inspection, visual inspection, and NDE results all linked in one searchable system.

Qualification Expiration Alerts

Zero lapsed quals

POD tracks every welder qualification expiration date and alerts you 30, 14, and 7 days before expiration. No more surprise lapses. No more retroactive non-conformances.

WPS-Welder Matrix Dashboard

Instant WPS matching

See which welders are qualified for which WPSs at a glance. When a pipe spec changes at a station, immediately identify which welders can continue and which need to be reassigned.

Key Features

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Last updated: February 2026