The 9% Advantage

91% of Projects Fail. Yours Won't.

91% of construction projects go over budget, over schedule, or both. The question isn't whether it will happen to you. The question is whether you'll see it coming. POD tracks cost and schedule performance in real time so you catch problems before they compound.

0%
Projects Over Budget/Schedule
0%
Finish On Time + On Budget
$0B
Wasted Annually (US)
0
Decisions Per Day

Why Most Projects End Up in the Red Zone

The 91% don't fail because of bad teams. They fail because problems hide in monthly reports while the project bleeds daily.

Budget variances compound silently

A 2% overspend in month one becomes 8% by month four. By the time someone catches it in a monthly report, the damage is done and recovery costs 3x what prevention would have.

Schedule slippage hides behind optimistic reporting

Everyone says they're "on track" until they aren't. Weekly reports mask daily slippage. By the time the PM sees the real numbers, critical path activities are already delayed.

Problems discovered too late to fix cheaply

Monthly earned value reports are autopsy reports — they tell you what went wrong, not what's going wrong. The projects that succeed catch problems in hours, not months.

$177 billion in annual industry waste

The U.S. construction industry wastes $177 billion every year on rework, delays, and miscommunication. Most of it starts with not knowing today's numbers until next month.

How the 9% Stay on Track

Daily data. Early warnings. Corrective action before variance compounds.

01

Start Every Morning With Data

Open POD to see real-time CPI, SPI, and completion forecast — before the first crew arrives. Know exactly where your project stands.

02

Catch Problems in Hours, Not Months

AI agents detect budget variances and schedule slippage within hours. Fix small problems before they compound into project-defining failures.

03

Finish On Time and On Budget

With daily visibility into performance metrics, your project stays on the green path. The 9% don't have better luck — they have better data.

Two Paths. One Choice.

100 projects start. 91 drift into the red zone. 9 stay on the green path. The difference? Daily data.

ON TIMEON BUDGETOVER BUDGETOVER SCHEDULEPOD0PROJECTS0PROJECTSTHE FORKDo you have daily data?100Projects

The Tools That Keep You on the Green Path

Real-time earned value tracking, AI-powered forecasting, and early warning systems that catch problems before they cost real money.

Real-Time CPI & SPI

Cost Performance Index and Schedule Performance Index updated daily from field data — not monthly from accounting. See problems when they're fixable.

Daily visibility, not monthly surprises

AI Completion Forecasting

AI agents analyze daily trends to predict your actual completion date — not the date on the baseline, but where you're really heading based on today's performance.

Know the real finish date, not the hoped-for one

Early Warning System

When CPI drops below 0.95 or SPI trends negative for 3 consecutive days, POD alerts the project team immediately. Early warnings, early corrections.

Fix problems while they're still small

Trend Analysis

Not just today's number — POD shows the trajectory. Is CPI improving or declining? Is the schedule recovery working? Trends tell the story numbers alone can't.

See the trend, not just the snapshot

Earned Value Dashboards

Professional earned value charts that would take a controls engineer hours to build — generated automatically from daily field reports.

Controls-quality data without controls-level effort

Variance Decomposition

Don't just know you're over budget — know why. POD decomposes variances by trade, by activity, by cost code so you can target the source.

Find the root cause, not just the symptom

The 9% Know Something You Don't — Yet

Dual earned value gauges and AI completion forecasting — the metrics that separate the 9% from everyone else.

Earned Value Performance

Cost Performance
0.80.91.01.11.20.70CPI
Critical
0.49CPI × SPI
Schedule Performance
0.80.91.01.11.20.70SPI
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

Completion Forecast

POD
d
BaselineP50P80P95
Confidence0%
VarianceNaNd
Base Cost$0
P50 Cost$0
On track: P50 0% confidence with NaNd margin

Built for the 9%

Dual EVM Gauges

CPI and SPI displayed as speedometer gauges — instant visual comprehension of cost and schedule performance in one glance

AI-Predicted Completion

Machine learning analyzes daily performance data to forecast your real completion date and cost-at-completion

Automatic Alerts

When metrics cross thresholds, POD notifies the right people immediately — PMs, supers, and owners get the right level of detail

Performance Trends

7-day, 30-day, and project-to-date trend lines show whether corrective actions are working or if more intervention is needed

Variance Root Cause

Decompose budget and schedule variances by trade, activity, and cost code to find exactly where problems originate

Executive Summary

One-page project health summary that executives can read in 60 seconds — green/amber/red with AI-written narrative

“We were 6% over budget before anyone noticed. With POD, we caught a 1.5% variance in week two and corrected it in three days. That single catch saved us $340,000. The 91% statistic is real — but it doesn't have to include you.”

— VP of Operations, National GC

Frequently Asked Questions

Join the 9%

See how real-time earned value tracking and AI forecasting keep your project on the green path.

POD doesn't conform — POD defines the standard.

Last updated: March 2026