Cleanroom Construction

One Particle Count Failure
Invalidates Months of Work

0K
K Particles/m3 ISO 7 Limit
0
Monitoring Points Per Room
0%
% Readings Logged Late
0
Min With POD

The Challenge

01

Particle count readings have timing gaps

ISO 14644 requires monitoring at specific intervals. Paper logs show entries at the right times but real measurements happen when someone remembers to walk over with the counter.

02

Differential pressure not continuously documented

Pressure differentials between cleanroom zones must be maintained and recorded. Manual pressure readings twice a day miss the 4 hours when the temporary wall leaked.

03

HEPA filter testing disconnected from install records

DOP or PAO scan test results for every HEPA filter stored in separate test reports. Linking test results to specific filter locations and installation dates requires manual cross-referencing.

04

Construction cleanliness protocol violations untracked

Sticky mats, gowning requirements, and material staging protocols exist on paper. Violations are corrected verbally and never documented for trend analysis.

The POD Advantage

Voice-logged particle counts

Zero monitoring gaps

Speak particle count readings with location, counter ID, and ambient conditions. POD timestamps every reading and flags gaps in the monitoring schedule.

Pressure differential tracking

Continuous pressure records

Record room-to-room pressure differentials with digital timestamps. POD alerts when readings miss scheduled intervals or fall below required thresholds.

HEPA filter test linkage

Filter-to-location traceability

Every filter scan test result linked to the specific filter serial number, location, and installation record. One click from filter location to full test history.

Protocol compliance monitoring

Protocol trend visibility

Cleanroom entry protocol compliance documented daily — gowning, sticky mat use, material staging. Trends visible before they become certification failures.

Cleanroom Construction Intelligence

“We passed all particle counts during construction then failed final certification because our monitoring records had a 6-hour gap on a Tuesday. Nobody could explain what happened during that window. POD would have flagged the gap in real time.”

— Cleanroom Validation Engineer, Pharma EPCM

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Protect Your Cleanroom Investment

See how POD documents cleanroom construction monitoring for ISO 14644 certification.

Last updated: February 2026