Subcontractor Intelligence

12 Subcontractors. Zero Visibility.
How POD Exposed the Coordination Crisis.

Apex General Contractors ran a $40M commercial build with 12 specialty subs. Weekly coordination meetings caught nothing. POD revealed 47 hidden failures in the first 30 days.

0
Subcontractors
0
Coordination Issues
0
Days Lost
$0.0M
Recovery Savings

The Blind Spot

Weekly sub meetings gave Apex a false sense of control. POD's Reliability Heatmap exposed month-over-month degradation that no one was tracking.

Subcontractor Reliability Heatmap6-Month Trend
SepOctNovDecJanFebELEC928875829195PLMB858790928893HVAC787268748086STEL959391949697CONC888579718390DRWL908682889294ROOF827865707785GLAZ918987909395FIRE878480768591ELEV949290889196LAND767268657480PANT899185879093AVG87%85%80%81%87%91%
90-100%
70-89%
Below 70%
HVAC, Roofing, and Landscaping consistently below 80%. November was the worst month across all trades.

Measuring What Matters

Coordination is not a feeling. POD quantifies it across six dimensions and shows exactly where trade relationships break down.

Coordination Score RadarPOD Exclusive
Communication0Schedule0Safety0Quality0Documentation0Resources00Overall Score
Before POD (0%)
After POD (0%)
0%
Before POD
0%
After POD

Trade Interactions

Not all trade overlaps are equal. Some pairs work seamlessly together while others generate conflict every time they share space. POD maps the invisible friction.

Crew Chemistry MatrixTrade Interactions
Elec + HVAC0%Steel + Conc0%Plumb + Fire0%Dry + Paint0%Roof + Glaz0%HVAC + Plumb0%Elec + Fire0%Steel + Elev0%Conc + Roof0%Glaz + HVAC0%
Good (80%+)
Fair (60-79%)
Conflict (<60%)
Size = Frequency
Plumbing + Fire Protection and Roofing + Glazing show conflict patterns. Schedule overlap causing 73% of disputes.

The Cost of Poor Coordination

Every coordination failure cascades into schedule impact. POD tracks the days lost per trade and shows the reduction achievable with real-time visibility.

Schedule Impact CascadeDays Lost per Trade
0d1d2d3d4d5d6dHVACRoofingConcreteLandscapingFire Prot.ElectricalPlumbingElevatorDays Lost to Coordination Failures
Without POD
With POD
0.0
Days Lost (Before)
0.0
Days Lost (After)
0%
Reduction

How POD Works

1

Speak Your Report

60-second voice input captures crew counts, trade activities, coordination notes, and safety observations.

2

AI Maps Coordination Data

POD automatically maps sub performance to reliability scores, coordination metrics, and trade interaction patterns.

3

Dashboard Reveals Blind Spots

Real-time heatmaps, radar charts, and cascade analysis expose coordination failures before they become schedule disasters.

The POD Advantage

From invisible coordination gaps to quantified trade intelligence in days, not months.

Reliability Scoring

Every subcontractor gets a data-driven reliability score updated daily. No more gut feelings or waiting for quarterly reviews to discover underperformance.

Daily sub visibility

Coordination Intelligence

Six-axis radar scoring quantifies trade coordination across communication, scheduling, safety, quality, documentation, and resource sharing.

6-dimension scoring

Trade Chemistry Analysis

POD maps which trade pairs work well together and which create conflict. Schedule overlapping trades strategically based on real interaction data.

Predict conflicts

Cascade Prevention

See exactly how many schedule days each coordination failure costs. POD flags cascade risks before one sub delay becomes a project-wide crisis.

67% fewer delays
Live Demo

Every KPI From a 5-Minute Voice Report

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Schedule vs Budget

Schedule & Budget Performance

SPI 0.00CPI 0.00
25%50%75%100%$0$755K$1.5M$2.3M$3.0MJanFebMarAprMayJun
Planned Progress
Actual Progress
Planned Spend
Actual Spend
SPI0.00
CPI0.00
Sched Var+0.0%
Cost Var+0.0%
Schedule 3.0% behind planbudget 1.8% under target
PODMomentum Score

Momentum Score

POD
0
Accelerating — Velocity: 0.0
Dimensions
Schedule+0.0
Budget+0.0
Quality0.0
Safety+0.0
Momentum0
Velocity0.0
Accel+0.0
Project accelerating — momentum 78, velocity increasing by 3.0/period

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

How Many Blind Spots Are Hiding in Your Subs?

See the Reliability Heatmap, Coordination Radar, and Cascade Analysis in the live demo.