Steel Price Spike.
$52M Project Saved.

Atlas Infrastructure was 6 months into a $52M commercial high-rise when a tariff announcement sent steel prices up 34% overnight. POD's supply chain KPIs detected the disruption within 48 hours, identified alternative suppliers, and saved $890K.

$0M
Project Value
0%
Price Increase
0 wks
Delivery Delay
$0K
Savings from Pivot

The Price Shock

Steel prices were steadily climbing throughout the year. Then the tariff announcement hit, and the budget assumption of $1,050/ton was instantly obsolete. Most contractors discover this on the next invoice. POD detected it in real time.

Material Price Trend

Structural steel $/ton over 12 months — tariff announcement triggers 34% spike

$800$900$1.0k$1.1k$1.2k$1.3k$1.4kJanFebMarAprMayJunJulAugSepOctNovDecBudget: $1,050
$1,050/ton
Budget Assumption
$1,380/ton
Peak Price
+$330/ton
Over-Budget
POD detected the price anomaly within 48 hours of the tariff announcement and triggered a supply chain alert.

Too Many Eggs, One Basket

National Steel Co supplied 45% of all structural steel for the project. When their prices surged and deliveries slipped to 12 weeks, the entire schedule was at risk. POD had been flagging this concentration risk for months.

Supplier Concentration Risk

One supplier holds 45% of your steel procurement — a single point of failure

Concentration Risk
National Steel Co
0%
Regional Metals
0%
Pacific Supply
0%
Metro Fabricators
0%
Direct Import
0%
Industry benchmark: no single supplier above 30%

The Delivery Domino

A 6-week steel delay cascades through the entire project: rebar stacking, concrete pours, MEP rough-in all shift. POD mapped every alternative supplier's lead time and found a path that cut the delay to just 1 week.

Delivery Delay Impact

Lead times by material category — planned vs actual vs POD-optimized (weeks)

0w2w4w6w8w10w12w14wStructural SteelRebarConcreteMEP ComponentsFinishes
Planned Lead Time
Actual Lead Time
With POD Alternative
+6 weeks
Steel Delay
+1 week
POD Recovery
5 weeks
Schedule Saved
3 of 5
On-Time Materials
POD identified Pacific Supply as an alternative steel source delivering in 7 weeks vs 12 weeks from the primary supplier.

Building Resilience

After the crisis, Atlas used POD's supply chain recommendations to diversify suppliers, lock in pricing, and build lead time buffers. Their resilience score jumped from 4/10 to 8/10 in three weeks.

Supply Chain Resilience Score

Overall resilience rating before and after POD optimization

Before POD0/10
Low Resilience
After POD Optimization0/10
Strong Resilience

Contributing Factors

Supplier Diversity
0/100/10
Lead Time Buffer
0/100/10
Alternative Sources
0/100/10
Price Lock Coverage
0/100/10
Inventory Buffer
0/100/10
POD recommendations increased resilience score from 4/10 to 8/10 within 3 weeks of implementation.

How POD Works

1

Speak Your Report

60-second voice input captures crew counts, material deliveries, supplier issues, and weather.

2

AI Structures Data

POD maps your input to hundreds of KPIs including supply chain metrics, price tracking, and supplier risk scores.

3

Dashboard Updates

Real-time material trend alerts, concentration risk warnings, and alternative supplier recommendations appear instantly.

Supply Chain KPIs That Protect Your Budget

Material Price Trend Tracking

Monitor commodity prices in real time. Get alerts when costs exceed budget assumptions before invoices arrive.

Early price detection

Supplier Concentration Risk Score

Know instantly if you are over-reliant on a single supplier. POD recommends diversification when any supplier exceeds 30%.

Risk diversification

Lead Time Monitoring

Track planned vs actual delivery times for every material category. POD flags delays as they develop, not after they impact the schedule.

Delivery assurance

Alternative Supplier Matching

When a primary supplier fails, POD identifies alternatives from your network that can deliver within your schedule window.

Rapid pivot capability

Supply Chain Resilience Score

A composite score combining supplier diversity, lead time buffers, price lock coverage, and inventory reserves. Know your vulnerability at a glance.

Composite visibility

Cost Impact Forecasting

When prices spike, POD calculates the total project cost impact immediately and models scenarios for alternative procurement strategies.

Financial foresight

“We would have found out about the steel price spike on our next invoice — 3 weeks too late. POD flagged it in 48 hours and showed us which suppliers could deliver within our window. That single alert saved us $890K and 5 weeks of schedule delay.”

Marcus Chen
VP of Procurement, Atlas Infrastructure
Live Demo

Every KPI From a 5-Minute Voice Report

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Schedule vs Budget

Schedule & Budget Performance

SPI 0.00CPI 0.00
25%50%75%100%$0$755K$1.5M$2.3M$3.0MJanFebMarAprMayJun
Planned Progress
Actual Progress
Planned Spend
Actual Spend
SPI0.00
CPI0.00
Sched Var+0.0%
Cost Var+0.0%
Schedule 3.0% behind planbudget 1.8% under target
PODMomentum Score

Momentum Score

POD
0
Accelerating — Velocity: 0.0
Dimensions
Schedule+0.0
Budget+0.0
Quality0.0
Safety+0.0
Momentum0
Velocity0.0
Accel+0.0
Project accelerating — momentum 78, velocity increasing by 3.0/period

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Protect Your Next Project from Supply Chain Shocks

See how POD's supply chain KPIs detect disruptions before they hit your budget.