Change Order Disputes

Prove Your Extra Work.
Before It Is Disputed.

The Challenge

Extra work performed without daily documentation

Your superintendent knows the work was extra. But without daily records showing exactly what was done, when, and by whom, you have no leverage in the negotiation.

T&M records are incomplete or missing

Time and material tracking requires daily labor and material documentation. When T&M records are reconstructed after the fact, they lose credibility and legal weight.

Changed conditions not photographed before covering

Differing site conditions discovered during excavation or demolition must be documented before work proceeds. But production pressure means photos get skipped.

Change order submissions lag months behind the work

By the time the change order is formally submitted, the daily records that would support it are scattered, incomplete, or lost entirely.

The POD Solution Path

1

Voice Documentation

Speak changed conditions and extra work into your daily report. Timestamped, GPS-tagged, voice-recorded documentation created in the moment it happens.

Real-time documentation
2

Photo Evidence

GPS-tagged photos of differing conditions, extra work, and T&M activities. Visual proof attached to the specific date and location automatically.

Visual proof
3

T&M Tracking

Daily time and material records captured during routine reporting. Labor hours, equipment usage, and materials linked to specific change order activities.

Daily T&M records
4

Change Order Packaging

POD compiles daily records, photos, and T&M data into a change order support package. Contemporaneous documentation that carries legal weight.

Claim-ready packages

Key Features

CO Tracking

Daily extra work documentation with photo and voice evidence.

Photo Evidence

GPS-tagged photos of changed conditions and extra work.

T&M Records

Daily time and material tracking linked to change orders.

“We had a $2.4M change order disputed because we could not prove the extra work was performed on specific dates. POD would have given us timestamped, GPS-tagged daily records.”

— VP of Operations, Mechanical Contractor

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.