Flooring QC

Moisture Testing Done
Right Before Flooring Goes Down

$0B
B Lost to Flooring Failures/Yr
0%
% Tests Done Last Minute
0
Days Concrete Needs to Dry
0
Min With POD

The Challenge

One-time testing is meaningless

A single moisture test the day before flooring goes down tells you nothing about the trend. Concrete can pass one day and fail the next depending on conditions.

Testing happens too late

82% of moisture tests happen in the final week before flooring installation. There is no time to remediate if results are high. The flooring goes down anyway.

Environmental conditions are untracked

HVAC running? Doors open? Humidity level? Moisture readings without environmental context are meaningless. Paper logs never capture the conditions.

Test locations are not mapped

You tested at 3 locations but the slab is 50,000 SF. Which areas were tested? Were they representative? Paper logs say tested slab but not where or how many.

The POD Solution Path

1

Voice-log moisture readings

Speak the reading: location, RH value, method used, environmental conditions. POD builds a moisture map and trend line for every test location.

Complete moisture record
2

Moisture trending

See moisture levels over time at each test location. Know whether the slab is drying on schedule or if remediation will be needed before flooring.

Predict flooring readiness
3

Test location mapping

Every test location documented with GPS coordinates. See coverage across the slab and identify areas that need additional testing.

Coverage verification
4

Threshold alerts

Moisture approaching the flooring manufacturer limit? POD alerts before installation. No more installing over marginal readings.

Stop bad installs

Moisture Intelligence

Moisture Trending

Track moisture levels over time at every test location. Predict drying timelines from historical data.

Test Coverage Map

Visual map of all test locations with current readings. Identify coverage gaps and high-moisture areas.

Warranty Protection

Complete moisture documentation that satisfies flooring manufacturer warranty requirements.

“Installed $200K of luxury vinyl over concrete that passed a one-time moisture test. It was buckled within 90 days. Trending data would have shown moisture was still migrating. POD tracks that trend.”

— Flooring Contractor, Commercial Interiors

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Stop Installing Flooring Over Wet Concrete

See how POD turns one-time moisture tests into trending data that prevents failures.