QC Records

Concrete Cylinders
Disappear Between Field and Lab

0%
% Cylinders Misidentified
0
Day Break Schedule
0
Pours Avg Before Results
0
Min With POD

The Challenge

Cylinder IDs get lost in transit

Cylinder set 47 cast on Tuesday arrives at the lab as set unknown on Wednesday. Mislabeled, smudged, or detached tags break the chain of custody.

7-day breaks missed regularly

The 7-day break is your early warning. When the lab misses the schedule or results sit in email for days, you lose the chance to react to low strength early.

Low strength found at 28 days is too late

A 28-day break at 80% of specified strength means the concrete is in place, formed over, and potentially loaded. Remediation options are expensive and limited.

No connection between cylinder and pour

Which specific pour does cylinder set 47 represent? What location? What batch? Paper tracking loses this connection almost immediately.

The POD Solution Path

1

Voice-log cylinder casting

Cast cylinders and speak the details: set number, pour location, batch ticket, concrete mix, air temp, concrete temp. POD creates the complete record.

Complete casting records
2

Break schedule alerts

POD tracks the 7 and 28-day break schedule for every set. Lab technicians get reminders. PMs get notified when results are due.

No missed breaks
3

Early strength trending

7-day results plotted against 28-day spec predictions. POD flags sets trending below target strength before the 28-day break confirms the problem.

Early warning on strength
4

Pour-to-cylinder linking

Every cylinder set permanently linked to its pour location, batch ticket, and mix design. Full traceability from placement to strength verification.

Full traceability

Concrete Quality Intelligence

Cylinder Registry

Every cylinder set tracked from casting through final break with full chain of custody documentation.

Strength Trending

Plot break results over time by mix design. Catch batch plant issues before they become structural problems.

Low Strength Alerts

Immediate notification when any break result falls below specification. React in hours, not weeks.

“Lab results came back at 2800 PSI on a 4000 PSI spec. By the time we got the 28-day break, we had poured the next 3 floors. POD would have flagged the 7-day trend immediately.”

— Structural Engineer, Concrete Frame Contractor

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Track Every Cylinder From Cast to Break

See how POD ensures no concrete cylinder ever gets lost between field and lab.

Last updated: February 2026