JHA Revolution

Your JHA Takes 20 Minutes.
It Should Take 2.

0
Min Traditional JHA
0
Min With POD
0%
% Time Saved
0%
% OSHA Compliant

The Challenge

JHAs are copied from yesterday

Your foreman copies yesterday JHA and changes the date. The hazards listed do not match today work. If OSHA reviews them, the carbon-copy pattern proves the documents are meaningless.

20 minutes that nobody has

A proper JHA requires identifying hazards, listing mitigations, and getting crew signatures. That takes 20 minutes. When concrete is arriving at 7 AM, that 20 minutes does not exist.

Generic hazards miss real risks

Copy-paste JHAs list generic hazards: "slips, trips, falls." The actual hazard today is a 600-amp temporary power connection next to a wet excavation. Generic JHAs protect nobody.

No record of crew acknowledgment

Paper JHA sign-in sheets are illegible, incomplete, and often backdated. You cannot prove that your crew reviewed and understood today specific hazards.

The POD Solution Path

1

Voice-Generated JHAs

Tell POD what work is planned today. AI generates an activity-specific JHA with relevant hazards and OSHA-compliant mitigations. Review and approve in 2 minutes.

2-min JHA creation
2

AI Hazard Identification

POD AI knows that concrete pours near electrical have different hazards than concrete pours in open areas. Activity-specific, location-aware, weather-adjusted hazard analysis.

Smart hazard ID
3

Digital Crew Acknowledgment

Crew members acknowledge the JHA via QR code scan or voice confirmation. Timestamped, verified, and linked to the specific JHA for that day and activity.

Digital signatures
4

JHA Compliance Analytics

Track JHA completion rates by crew, by activity, by project. Identify which crews skip JHAs, which activities lack documentation, and where your risk exposure is highest.

Compliance tracking

JHA Features

Voice JHA

Describe planned work. POD generates the JHA with proper hazards and mitigations.

Smart Hazards

AI identifies hazards based on activity, location, weather, and site conditions.

Digital Sign-Off

QR-code crew acknowledgment with timestamps. No paper sign-in sheets.

“Our JHAs were copies of copies. Same hazards, same mitigations, every single day regardless of the actual work. POD generates activity-specific JHAs from the daily plan. Our safety team finally trusts the documents.”

— Safety Director, Industrial Contractor

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

When Was the Last Time Your JHA Was Actually Specific to the Work?

If it was copied from yesterday, it is not protecting your crew. POD fixes that.

Last updated: February 2026