Material QC

Material Deliveries
Verified by Nobody

0%
% Deliveries With Errors
0
Days Avg to Find Errors
$0K
K Lost to Wrong Materials/Yr
0
Min With POD

The Challenge

Nobody checks what comes off the truck

Deliveries happen during the busiest part of the day. Your crew signs the ticket, offloads the material, and moves on. Verification takes time nobody has.

Wrong materials get installed

Wrong grade steel, wrong size pipe, wrong specification insulation. If nobody catches it at delivery, it gets installed. Rework costs 10x the material cost.

Quantity discrepancies go unnoticed

The ticket says 200 sheets of drywall. You received 180. By the time you run short next week, the supplier denies the shortage because you signed the ticket.

Damaged materials accepted without documentation

Material arrives damaged. Your crew offloads it anyway. Without photos and documentation at time of delivery, the supplier denies the claim.

The POD Solution Path

1

Voice-verify every delivery

Speak the material type, quantity, specification, and condition as it comes off the truck. POD matches it against the purchase order.

Verified at the truck
2

Photo documentation

Snap photos of material labels, condition, and quantity. POD links photos to the delivery record and purchase order.

Visual evidence
3

Discrepancy alerts

Quantity does not match PO? Specification is different? Material is damaged? POD alerts the PM before the truck leaves the site.

Catch errors at delivery
4

Delivery tracking dashboard

See all deliveries, pending orders, and discrepancies in one view. Know what is on site, what is coming, and what has issues.

Delivery visibility

Material Intelligence

PO Matching

Every delivery automatically matched against purchase orders. Discrepancies flagged before acceptance.

Photo Verification

Visual evidence of material condition, labels, and quantities at time of delivery.

Discrepancy Tracking

Track every discrepancy from identification through resolution with supplier.

“We installed 200 feet of wrong-size pipe because nobody verified the delivery. The rework cost us $85K and 2 weeks of schedule. POD would have caught it at the truck.”

— Superintendent, Mechanical Contractor

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Verify Every Delivery Before It Gets Installed

See how POD catches material errors at the truck instead of during rework.

Last updated: February 2026