Multi-Family Residential Construction

300 Units. 50 Subs.
Zero Spreadsheets.

0
Units Tracked
0
Punch Items Logged
0s
Sec Report Time
0
Subcontractors

The Challenge

01

Unit-by-unit tracking at scale is overwhelming

Is Unit 4B ready for paint? Did Unit 7C pass the rough-in inspection? Tracking 300+ units through 12 phases manually is impossible.

02

Punch lists multiply exponentially

Every unit generates 15-20 punch items. Multiply by 300 units and you have thousands of items to track, assign, and close out.

03

50+ subcontractors need daily coordination

Framers, plumbers, electricians, drywall, paint, flooring, cabinets — the subcontractor density per square foot is the highest in construction.

04

Tight margins mean no room for rework

Multi-family margins are razor thin. One week of rework on a floor can wipe out the profit on 20 units.

The POD Advantage

Unit-by-Unit Progress Grid

300 units at a glance

Visual grid showing every unit, every phase, every status. Know instantly which units are ready for the next trade.

Punch List Management

Close-out accelerated

Photo-documented punch items assigned to the responsible sub with due dates. Track open, in-progress, and closed items.

$0 Subcontractor Reporting

Free for all subs

Subs submit daily progress via upload link. No account required, no per-user fee. Getting 52 subs to actually report.

Building-Level Dashboard

Portfolio to detail

Progress, labor, safety, and quality metrics rolled up by building, by floor, by unit. Drill down from portfolio to punch item.

Multi-Family Features

“I manage 300 units across 4 buildings with 52 subs. Before POD, my punch list was an Excel file with 6,000 rows that three people were editing simultaneously.”

— Project Manager, 312-Unit Mixed-Use Development

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready to Tame Multi-Family Complexity?

See how POD handles hundreds of units and dozens of subcontractors.

Last updated: February 2026