Claims Risk Alert

You Lost a $3M Delay Claim.
Here Is Why.

0%
% Claims That Fail
$0M
M Avg Claim Value
0mo
Mo Avg Resolution
0
Wins Without Docs

The Challenge

01

Delays documented weeks after the fact

Your PM notices a 30-day delay at the monthly schedule update. But the daily reports from those 30 days say nothing about it. Now you are trying to prove it retroactively.

02

No standard delay categorization

Is it an excusable delay? Compensable? Concurrent? Without standardized categories applied daily, your claims analyst spends months reconstructing what happened.

03

Weather delays lack correlation proof

You claim 15 weather days. The owner says the weather was not that bad. Without automated weather data correlated with your actual planned activities, you lose.

04

No critical path impact documentation

Proving a delay impacted the critical path requires daily documentation of what was planned vs what was accomplished. Spreadsheets do not capture this at the daily level.

The POD Advantage

Real-Time Delay Documentation

Same-day capture

Document delays as they happen with voice, photos, and standardized categories. Every delay event is captured on the day it occurs with contemporaneous evidence.

AACE Delay Categories Built In

AACE-standard

Owner-caused, weather, differing site conditions, permitting, material delays — all standardized per AACE recommended practices. Your claims consultant will kiss you.

Automated Weather Correlation

Verified weather data

NOAA weather data automatically linked to your daily schedule activities. POD proves which activities were weather-impacted with third-party verification.

Daily Plan vs Actual Tracking

Daily variance proof

Every day captures what was planned and what was accomplished. The delta builds your delay narrative automatically over the life of the project.

Claims-Ready Documentation

“We had a legitimate 90-day owner-caused delay worth $2.8 million. Our daily reports were so inconsistent that the arbitrator gave us 12 days. We left $2.4 million on the table.”

— VP of Operations, Heavy Civil Contractor

Live Demo

Your Competitors Track Safety Like This

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

EMR Gauge

Experience Modification Rate

1.00.51.5
0.50
Industry Avg: 1.00
Good
ImprovingPrior Year: 0.95
PODTraining Compliance

Training Compliance

Good
0.0%Compliance
Overall
OSHA 30
Fall Protection
Confined Space
First Aid/CPR
Certified / Total0% rate
0 Certified0 Remaining
Certified0
Expiring0
Hours YTD0
OSHA 300/0
8 exp
Fall Protection0/0
5 exp
Confined Space0/0
3 exp
First Aid/CPR0/0
12 exp

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

How Much Did Your Last Failed Claim Cost You?

Stop leaving millions on the table. Start building claims-ready records today.

Last updated: February 2026