Built for Estimators

Historical Data.
Better Bids.

The Challenge

01

Production rates are based on outdated assumptions

Your estimating database uses production rates from projects completed years ago. Crew sizes have changed, methods have evolved, but your rates have not.

02

Labor cost data is trapped in payroll systems

Actual labor costs by activity exist in your payroll system but are never connected to field production data. You cannot calculate true cost per unit installed.

03

Equipment costs are allocated, not tracked

Equipment costs are allocated by percentage, not by actual utilization. You do not know the true cost of the crane on your last bridge project.

04

Bid accuracy feedback is delayed by months

You find out if your estimate was accurate 6-12 months after bidding. By then, you have bid 20 more projects with the same potentially inaccurate rates.

The POD Advantage

Actual Production Rates

Real rates, not guesses

Daily field reports capture quantities installed by crew. POD calculates actual production rates per activity, per crew size, per project type.

True Labor Costs

Actual cost per unit

Crew hours from daily reports matched to quantities installed. Calculate actual cost per unit for every activity across all completed projects.

Equipment Utilization Data

True equipment costs

Equipment hours tracked daily in field reports. Calculate true equipment costs per activity based on actual utilization, not allocation.

Real-Time Bid Feedback

Continuous improvement

Compare estimated vs actual production as projects progress. Adjust future bids based on real-time performance data, not post-project analysis.

Key Features

“I used to guess at production rates based on 20-year-old data. POD gives me actual rates from our last 12 projects. Our bids are tighter and our margins are better.”

— Chief Estimator, Mechanical Contractor

Live Demo

Built for How You Actually Work

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODHeadcount Tracker

Workforce Headcount

StableFully Staffed
0%Staffed
Electricians0
Iron Workers0
Operators0
Laborers0
Staffing Trend
ActualPlanned
JanFebMarAprMayJun
Current Headcount
Under plan by 160 Stable
0of 160
Fill Rate
0%
Gap
160short
Peak
158May
Avg Staffing
0of 160 plan
0% filled — fully staffed
Peak: 158 at May
Low: 142 at Jan

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready to Transform Your Reporting?

Join thousands of construction professionals using POD.

Last updated: February 2026