Risk Managers & Insurance Professionals

Your EMR Determines Your Profitability.
POD Determines Your EMR.

0%
% EMR Reduction
$0
Annual Premium Savings
0%
% Incident Documentation
0
Safety KPIs Tracked

The Challenge

01

High EMR means high premiums and lost bids

Your EMR directly impacts your insurance cost AND your ability to win work. An EMR above 1.0 can disqualify you from bids before price is even considered.

02

Claims documentation is always insufficient

When an incident becomes a claim, your insurance carrier needs detailed documentation. Paper-based incident reports create gaps that increase claim costs.

03

Leading indicators are not tracked

You track lagging indicators (incidents) but not leading indicators (near-misses, observations, training). Without leading indicator data, you cannot prevent incidents.

04

Safety prequalification eats weeks of staff time

ISNetworld, Avetta, PICS, and Veriforce all want the same data in different formats. Preparing prequalification submissions is a full-time job.

The POD Advantage

EMR Reduction Through Data

Lower EMR trajectory

Systematic incident tracking, root cause analysis, and corrective action follow-through. Every incident managed to minimize its impact on your EMR.

Claims-Ready Documentation

Claims costs reduced

Every incident is documented with photos, witness statements, and timestamps. When a claim is filed, the documentation package is already complete.

Leading Indicator Dashboard

Prevention quantified

Near-miss frequency, safety observation rates, training completion, and toolbox talk attendance — all tracked and trended.

Prequalification Data Export

Prequal automated

TRIR, DART, EMR, and safety program documentation exportable in ISNetworld, Avetta, and PICS formats. Prequalification in hours, not weeks.

Risk & Insurance Features

“Our EMR dropped from 1.2 to 0.84 in two years. Our insurance broker said POD data was the single biggest factor — they could see we were actually managing safety, not just reporting it.”

— Risk Manager, National Specialty Contractor

Live Demo

Built for How You Actually Work

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODHeadcount Tracker

Workforce Headcount

StableFully Staffed
0%Staffed
Electricians0
Iron Workers0
Operators0
Laborers0
Staffing Trend
ActualPlanned
JanFebMarAprMayJun
Current Headcount
Under plan by 160 Stable
0of 160
Fill Rate
0%
Gap
160short
Peak
158May
Avg Staffing
0of 160 plan
0% filled — fully staffed
Peak: 158 at May
Low: 142 at Jan

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Last updated: February 2026