Carbon Capture Construction

Carbon Capture.
Construction Intelligence.

$0B
B+ DOE Funding
0%
% EPA Compliant
0
Documentation Gaps
0Q
Q Tax Credit Ready

The Challenge

01

Novel construction processes

CCUS facilities involve absorber towers, compressors, dehydration units, and injection wells. Few construction teams have built these before. Documentation of lessons learned is critical.

02

Complex EPA permitting and monitoring

EPA Class VI well permits for CO2 sequestration require extensive construction documentation. Underground injection control compliance must be demonstrated throughout construction.

03

Multi-discipline integration

Carbon capture projects combine process engineering, pipeline construction, and well drilling. Each discipline has different reporting needs that must be unified for project management.

04

IRS 45Q tax credit documentation

The 45Q tax credit for carbon capture requires detailed construction and operational documentation. Missing records can jeopardize millions in tax incentives.

The POD Advantage

Adaptive CCUS Templates

CCUS-specific

Daily report templates designed for capture facility construction, CO2 pipeline installation, and sequestration well drilling. Capture lessons learned and novel construction methods.

EPA Compliance Documentation

EPA Class VI ready

Class VI well construction documentation, underground injection control records, and environmental monitoring logs integrated into daily reports automatically.

Multi-Discipline Reporting

Unified reporting

Unified daily reporting across process construction, pipeline, and well drilling disciplines. Each discipline reports their data while contributing to the unified project picture.

45Q Documentation Support

45Q compliant

Construction records formatted for IRS 45Q tax credit compliance. Equipment specifications, capacity data, and operational readiness documentation organized for credit claims.

Carbon Capture Features

“Carbon capture construction combines chemical plant complexity with pipeline construction demands. POD handled both disciplines in one unified daily reporting platform.”

— Project Manager, CCUS Hub Project

Live Demo

What You Get With POD That Nobody Else Has

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 4 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODMomentum Score

Momentum Score

POD
0
Accelerating — Velocity: 0.0
Dimensions
Schedule+0.0
Budget+0.0
Quality0.0
Safety+0.0
Momentum0
Velocity0.0
Accel+0.0
Project accelerating — momentum 78, velocity increasing by 3.0/period
EMR Gauge

Experience Modification Rate

1.00.51.5
0.50
Industry Avg: 1.00
Good
ImprovingPrior Year: 0.95
PODCash Flow Analysis

Cash Flow Analysis

Ratio: 0.00x
Positive
Total Inflow
$0$0 avg/period
Total Outflow
$0$0 avg/period
Net Position
+$0+$42K avg/period
$153K$305K$458K$610K+$0Jan+$0Feb+$0Mar+$0Apr+$0May+$0Jun
Best: Apr (+$70K)
Deficit: Mar (-$40K)
Avg Net: +$42K/period
Inflow Outflow Cumulative Net

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Building Carbon Capture Infrastructure?

See how POD handles the unique demands of CCUS construction.

Last updated: February 2026