Solar Crew Productivity

See Which Crews Perform Best.
Replicate Their Success.

The Challenge

01

No visibility into crew output

You know the total modules installed but have no idea which crews are fast and which are falling behind.

02

Labor allocation is guesswork

Moving crews between blocks is based on gut feeling, not data. Sometimes you make things worse.

03

Productivity data arrives too late

Weekly production reports show you last week. By then, underperforming crews have cost you five more days.

04

Cannot identify training needs

Without crew-level data, you cannot tell if slow production is a training issue, a material issue, or a layout issue.

The POD Advantage

Crew-Level Production Tracking

Granular visibility

See modules installed per crew per day. Compare performance across blocks, shifts, and subcontractors.

Data-Driven Labor Allocation

Optimized placement

Move crews to where they are most effective based on actual production data, not guesswork.

Real-Time Productivity Alerts

Same-day intervention

Get alerts when a crew falls below expected production rates. Intervene the same day, not next week.

Productivity Trend Analysis

Continuous improvement

Track crew improvement over time. Identify what top crews do differently and replicate across the project.

Key Features

“We found our top crews were 40% faster. Once we studied their methods, average productivity jumped 34%.”

— Operations Director, Solar EPC Contractor

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.