Solar Heat Illness Prevention

Protect Your Crews From Heat.
Document Every Precaution.

The Challenge

01

Heat exposure is the top solar hazard

Open desert sites with zero shade and reflective panels create extreme heat conditions that injure workers every summer.

02

Rest break compliance is undocumented

You tell crews to take breaks but have no record that breaks actually happened. That is a liability gap.

03

WBGT readings are not tracked consistently

Wet bulb globe temperature readings are taken sporadically, if at all. No historical data for trend analysis.

04

Heat illness response has no paper trail

When a worker shows heat stress symptoms, the response is verbal. No documentation means no defensible record.

The POD Advantage

Automated WBGT Monitoring

Continuous monitoring

POD integrates with on-site weather stations to log WBGT readings automatically throughout the day.

Mandatory Rest Break Logging

Documented compliance

Supervisors log rest breaks with timestamps and crew counts. Proof that your heat illness plan was followed.

Tiered Heat Alert System

Proactive protection

Automatic alerts at caution, warning, and danger thresholds. Each tier triggers specific documented actions.

Heat Response Documentation

Defensible records

When heat incidents occur, document response steps in real time with timestamps, photos, and outcomes.

Key Features

“We logged 2,400 rest breaks last summer. When OSHA asked about our heat illness plan, we had every record.”

— EHS Manager, Desert Solar Construction

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.