Solar Safety KPIs

Safety Data That Drives Action.
Updated in Real Time.

The Challenge

01

Safety metrics scattered across spreadsheets

Every site manager tracks safety differently. Getting a portfolio-wide view takes days of manual work.

02

TRIR calculated quarterly, far too late

By the time you calculate your rate, the incidents already happened. Quarterly reporting is purely reactive.

03

Heat illness risks are invisible

Solar sites face extreme heat exposure but tracking rest breaks, hydration, and WBGT readings is entirely manual.

04

Leading indicators have no dashboard

You know lagging indicators. But safety observations, near-misses, and participation rates have no single view.

The POD Advantage

Auto-Calculated TRIR and DART

Real-time safety rates

TRIR, DART, and severity rates calculated automatically from field reports. Always current, always accurate.

Heat Illness Prevention Dashboard

Heat safety visibility

Track WBGT readings, rest breaks, hydration stations, and heat alerts across all solar sites in one view.

Leading Indicator Tracking

Predictive insights

Safety observations, near-misses, and toolbox talk participation displayed as leading indicators.

Executive Safety Summaries

Board-ready in 1 click

Auto-generated safety dashboards your leadership team can access anytime. No manual report building.

Key Features

“We went from quarterly safety reviews to real-time dashboards. Our TRIR dropped 45% in six months.”

— Safety Director, Solar EPC Contractor

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Last updated: February 2026