Telecom Field Safety

Tower Safety Documentation.
Captured at the Climb.

The Challenge

01

Safety checklists completed after the climb

Pre-climb safety forms are supposed to happen before the climb. In reality, crews fill them out in the truck afterward.

02

Fall protection logs are incomplete

Harness inspections, anchor point checks, and tie-off verification are critical. Paper forms miss steps.

03

RF exposure documentation is inconsistent

Every carrier has different RF safety requirements. Crews cannot keep track of which form to use at which site.

04

Rescue plans buried in binders

Site-specific rescue plans sit in a binder in the truck. When you need them, you need them fast, not filed away.

The POD Advantage

Pre-Climb Digital Checklists

Verified pre-climb

Crews complete safety checklists on their phone before climbing. GPS and timestamp prove it happened on site.

Fall Protection Log Templates

Complete documentation

Step-by-step fall protection verification. Harness, anchor, lanyard, and tie-off all documented with photos.

Carrier-Specific RF Templates

Carrier-compliant

RF exposure checklists mapped to each carrier requirement. The right form loads automatically for each site.

Instant Rescue Plan Access

Seconds to access

Site-specific rescue plans available on any crew phone. One tap to pull up the plan when seconds matter.

Key Features

“We finally have proof that pre-climb safety checks are happening before crews go up, not after.”

— Safety Director, Tower Construction Company

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready to Transform Your Reporting?

Join thousands of construction professionals using POD.

Last updated: February 2026